Utah Admin. Code R23-6-4 - Scope
(1) To the extent
appropriated by the Legislature, value engineering will be applied to achieve
cost effective design solutions and informed decision-making by the division,
for the following activities:
|
TABLE |
|
|
PROGRAMMING |
|
|
1. Site Selection |
as feasible |
|
2. Existing Facilities |
Over 30,000 GSF |
|
3. Energy Conservation |
Always |
|
4. New Facilities |
Over 30,000 GSF |
|
DESIGN FOR CONSTRUCTION |
|
|
1. New Construction |
Over 30,000 GSF |
|
2. Renovation |
Over 30,000 GSF |
|
3. Energy Conservation |
Always |
(2)
Only facilities which fall below these area requirements will be automatically
exempted. Other projects may be subjected to life cycle cost analysis at the
discretion of the director.