Utah Admin. Code R277-471-2 - Definitions
(1) "Certified plans examiner" means a
professional who has current applicable commercial certification through the
"International Code Council" or "ICC".
(2) "Charter school" means a school
acknowledged as a charter school by a charter school authorizer consistent with
Title 53G, Chapter 5, Part 3, Charter School Authorization.
(3) "Charter school responsible person or
local charter school board building officer or designee" or "CSBBO" means the
individual or authority designated by a charter school governing board who:
(a) has direct administrative and operational
control of charter school construction or renovation; and
(b) has responsibility for a charter school's
compliance with Utah law on behalf of the charter school governing
board.
(4) "Certificate
of inspection verification" means a form, available on the Board website,
certifying that the entity responsible for providing inspection services has
complied with the provisions of:
(a) Section
53E-3-706;
(b) Section
53E-3-708;
(c) Section
10-9a-305;
(d) Section
17-27a-305;
(e) Title 15A, State Construction and Fire
Code Act;
(f) Rule R156-56;
and
(g) this Rule
R277-471.
(5)
"Certificate of occupancy" means the document issued upon receipt of the final
inspection from the inspector of record and the 'Certificate of Fire Clearance'
issued by the Utah State Fire Marshal, verifying compliance with all minimum
requirements to safeguard the public health, safety, and general welfare of
occupants, which authorizes permanent usage or occupancy of:
(a) any new building or occupiable
structure;
(b) any existing
occupiable building or structure alteration; or
(c) a change of occupancy in an existing
structure, building, or space.
(6) "General plan" means a document that a
municipality adopts that sets forth general guidelines for proposed future
development of the land within the municipality, consistent with Subsection
10-9a-103(13).
(7) "Inspector" means a professional who
holds current applicable commercial certification through the International
Code Council and is currently licensed in the in Utah in the applicable trades
for which the inspector is performing inspections.
(8) "Manual" means the School Construction
Resource Manual incorporated by reference in Section
R277-471-3.
(9) "New school building project" means the
construction of a school that did not previously exist in an LEA.
(10) "Public school construction" means
construction work on a new or existing public school building.
(11) "School District Building Official or
"SDBO" means the individual or authority designated by a school district who
has direct administrative and operational control of school district
construction or renovation and is responsible for the school district's
compliance with Utah law.
(12)
"Significant school remodel" means the upgrading, changing, alteration,
refurbishment, modification, or complete substitution or replacement of an
existing school in an LEA with a project cost equal to or in excess of
$2,000,000.
(13) "Temporary
certificate of occupancy" means the document, valid for a limited time period,
issued upon receipt of the temporary final inspection report from the inspector
of record and the 'Temporary Certificate of Fire Clearance' issued by the Utah
State Fire Marshal, verifying minimum requirements to safeguard the public
health, safety, and general welfare of occupants, which authorizes temporary
usage or occupancy of:
(a) any new building or
occupiable structure;
(b) any
existing occupiable building or structure alteration; or change of occupancy in
an existing structure or building or space.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.