Utah Admin. Code R315-265-118 - Closure and Post-Closure - Post-Closure Plan; Amendment of Plan
(a) Written plan. By May 19, 1981, the owner
or operator of a hazardous waste disposal unit shall have a written
post-closure plan . An owner or operator of a surface impoundment or waste pile
that intends to remove all hazardous wastes at closure shall prepare a
post-closure plan and submit it to the Director within 90 days of the date that
the owner or operator or Director determines that the hazardous waste
management unit or facility shall be closed as a landfill, subject to the
requirements of Sections R315-265-117 through 265-120.
(b) Until final closure of the facility , a
copy of the most current post-closure plan shall be furnished to the Director
upon request, including request by mail. In addition, for facilities without
approved post-closure plans, it shall also be provided during site inspections,
on the day of inspection , to any officer, employee or representative of the
Director . After final closure has been certified, the person or office
specified in Subsection R315-265-118(c)(3) shall keep the approved post-closure
plan during the post-closure period.
(c) For each hazardous waste management unit
subject to the requirements of this Section R315-265-118, the post-closure plan
shall identify the activities that will be carried on after closure of each
disposal unit and the frequency of these activities, and include at least:
(1) A description of the planned monitoring
activities and frequencies at which they will be performed to comply with
Sections R315-265-90 through 265-94, R315-265-220 through 265-231, R315-265-250
through 265-260, and subparts M, and N of 40 CFR 265, which are adopted and
incorporated by reference, during the post-closure care period; and
(2) A description of the planned maintenance
activities, and frequencies at which they will be performed, to ensure:
(i) The integrity of the cap and final cover
or other containment systems in accordance with the requirements of Sections
R315-265-90 through 265-94, R315-265-220 through 265-231, R315-265-250 through
265-260, and subparts M, and N of 40 CFR 265, which are adopted and
incorporated by reference; and
(ii)
The function of the monitoring equipment in accordance with the requirements of
Sections R315-265-90 through 265-94, R315-265-220 through 265-231, R315-265-250
through 265-260, and subparts M, and N of 40 CFR 265, which are adopted and
incorporated by reference; and
(3) The name, address, and phone number of
the person or office to contact about the hazardous waste disposal unit or
facility during the post-closure care period.
(4) For facilities subject to Section
R315-265-121, provisions that satisfy the requirements of Subsections
R315-265-121(a)(1) and (3).
(5) For
facilities where the Director has applied alternative requirements at a
regulated unit under Subsections R315-265-90(f), R315-265-110(d),
R315-265-140(d), or all three, either the alternative requirements that apply
to the regulated unit, or a reference to the enforceable document containing
those requirements.
(d)
Amendment of plan. The owner or operator may amend the post-closure plan any
time during the active life of the facility or during the post-closure care
period. An owner or operator with an approved post-closure plan shall submit a
written request to the Director to authorize a change to the approved plan. The
written request shall include a copy of the amended post-closure plan for
approval by the Director .
(1) The owner or
operator shall amend the post-closure plan whenever:
(i) Changes in operating plans or facility
design affect the post-closure plan , or
(ii) Events which occur during the active
life of the facility , including partial and final closures, affect the
post-closure plan .
(iii) The owner
or operator requests the Director to apply alternative requirements to a
regulated unit under Subsections R315-265.90(f), R315-265.110(d),
R315-265.140(d) or all three.
(2) The owner or operator shall amend the
post-closure plan at least 60 days prior to the proposed change in facility
design or operation, or no later than 60 days after an unexpected event has
occurred which has affected the post-closure plan .
(3) An owner or operator with an approved
post-closure plan shall submit the modified plan to the Director at least 60
days prior to the proposed change in facility design or operation, or no more
than 60 days after an unexpected event has occurred which has affected the
post-closure plan . If an owner or operator of a surface impoundment or a waste
pile who intended to remove all hazardous wastes at closure in accordance with
Subsections R315-265-228(b) or R315-265-258(a) is required to close as a
landfill in accordance with
40 CFR
265.310, which is adopted and incorporated by
reference, the owner or operator shall submit a post-closure plan within 90
days of the determination by the owner or operator or Director that the unit
shall be closed as a landfill. If the amendment to the post-closure plan is a
Class 2 or 3 modification according to the criteria in Section
R315-270-42,
the modification to the plan will be approved according to the procedures in
Subsection R315-265-118(f).
(4) The
Director may request modifications to the plan under the conditions described
in Section R315-265-118(d)(1). An owner or operator with an approved
post-closure plan shall submit the modified plan no later than 60 days of the
request from the Director . If the amendment to the plan is considered a Class 2
or 3 modification according to the criteria in Section
R315-270-42,
the modifications to the post-closure plan will be approved in accordance with
the procedures in Subsection R315-265-118(f). If the Director determines that
an owner or operator of a surface impoundment or waste pile who intended to
remove all hazardous wastes at closure shall close the facility as a landfill,
the owner or operator shall submit a post-closure plan for approval to the
Director within 90 days of the determination.
(e) The owner or operator of a facility with
hazardous waste management units subject to these requirements shall submit his
post-closure plan to the Director at least 180 days before the date he expects
to begin partial or final closure of the first hazardous waste disposal unit.
The date he "expects to begin closure" of the first hazardous waste disposal
unit shall be either within 30 days after the date on which the hazardous waste
management unit receives the known final volume of hazardous waste or, if there
is a reasonable possibility that the hazardous waste management unit will
receive additional hazardous wastes, no later than one year after the date on
which the unit received the most recent volume of hazardous wastes. The owner
or operator shall submit the post-closure plan to the Director no later than 15
days after:
(1) Termination of interim status,
except when a permit is issued to the facility simultaneously with termination
of interim status; or
(2) Issuance
of a judicial decree or final orders under section 3008 of RCRA to cease
receiving wastes or close.
(f) The Director will provide the owner or
operator and the public, through a newspaper notice, the opportunity to submit
written comments on the post-closure plan and request modifications to the plan
no later than 30 days from the date of the notice. He will also, in response to
a request or at his own discretion, hold a public hearing whenever such a
hearing might clarify one or more issues concerning a post-closure plan . The
Director will give public notice of the hearing at least 30 days before it
occurs. Public notice of the hearing may be given at the same time as notice of
the opportunity for the public to submit written comments, and the two notices
may be combined. The Director will approve, modify, or disapprove the plan
within 90 days of its receipt. If the Director does not approve the plan he
shall provide the owner or operator with a detailed written statement of
reasons for the refusal and the owner or operator shall modify the plan or
submit a new plan for approval within 30 days after receiving such written
statement. The Director will approve or modify this plan in writing within 60
days. If the Director modifies the plan, this modified plan becomes the
approved post-closure plan . The Director shall ensure that the approved
post-closure plan is consistent with Sections R315-265-117 through 265-120. A
copy of the modified plan with a detailed statement of reasons for the
modifications shall be mailed to the owner or operator.
(g) The post-closure plan and length of the
post-closure care period may be modified any time prior to the end of the
post-closure care period in either of the following two ways:
(1) The owner or operator or any member of
the public may petition the Director to extend or reduce the post-closure care
period applicable to a hazardous waste management unit or facility based on
cause, or alter the requirements of the post-closure care period based on
cause.
(i) The petition shall include
evidence demonstrating that:
(A) The secure
nature of the hazardous waste management unit or facility makes the
post-closure care requirement(s) unnecessary or supports reduction of the
post-closure care period specified in the current post-closure plan , for
example, leachate or ground-water monitoring results, characteristics of the
wastes, application of advanced technology, or alternative disposal, treatment,
or re-use techniques indicate that the facility is secure, or
(B) The requested extension in the
post-closure care period or alteration of post-closure care requirements is
necessary to prevent threats to human health and the environment, e.g.,
leachate or ground-water monitoring results indicate a potential for migration
of hazardous wastes at levels which may be harmful to human health and the
environment.
(ii) These
petitions will be considered by the Director only when they present new and
relevant information not previously considered by the Director . Whenever the
Director is considering a petition, he will provide the owner or operator and
the public, through a newspaper notice, the opportunity to submit written
comments within 30 days of the date of the notice. He will also, in response to
a request or at his own discretion, hold a public hearing whenever a hearing
might clarify one or more issues concerning the post-closure plan . The Director
will give the public notice of the hearing at least 30 days before it occurs.
Public notice of the hearing may be given at the same time as notice of the
opportunity for written public comments, and the two notices may be combined.
After considering the comments, he will issue a final determination, based upon
the criteria set forth in Subsection R315-265-118(g)(1).
(iii) If the Director denies the petition, he
will send the petitioner a brief written response giving a reason for the
denial.
(2) The Director
may tentatively decide to modify the post-closure plan if he deems it necessary
to prevent threats to human health and the environment. He may propose to
extend or reduce the post-closure care period applicable to a hazardous waste
management unit or facility based on cause or alter the requirements of the
post-closure care period based on cause.
(i)
The Director will provide the owner or operator and the affected public,
through a newspaper notice, the opportunity to submit written comments within
30 days of the date of the notice and the opportunity for a public hearing as
in Subsection R315-265-118(g)(1) (ii). After considering the comments, he will
issue a final determination.
(ii)
The Director will base his final determination upon the same criteria as
required for petitions under Subsection R315-265-118(g)(1)(i). A modification
of the post-closure plan may include, where appropriate, the temporary
suspension rather than permanent deletion of one or more post-closure care
requirements. At the end of the specified period of suspension, the Director
would then determine whether the requirement(s) should be permanently
discontinued or reinstated to prevent threats to human health and the
environment.