Utah Admin. Code R315-270-42 - Hazardous Waste Permit Program - Permit Modification at the Request of the Permittee
Table
Appendix I to Section R315-270-42 - Classification of
Modifications |
Class |
A. General |
|
1. Administrative and informational changes |
1 |
2. Correction of typographical errors |
1 |
3. Equipment replacement or upgrading with functionally equivalent components, such as pipes, valves, pumps, conveyors, controls |
1 |
4. Changes in the frequency of or procedures for
|
|
a. To provide for more frequent |
1 |
b. Other changes, |
2 |
5. |
|
a. Changes in interim compliance dates, with prior
approval of the |
11 |
b. Extension of final compliance date |
3 |
6. Changes in expiration date of |
11 |
7. Changes in ownership or operational control of a
|
11 |
8. Changes to remove |
11 |
9. Changes to remove |
11 |
10. Changes in the expiration date of a |
11 |
B. General |
|
1. Changes to |
|
a. To conform with agency guidance or rules |
1 |
b. To incorporate changes associated with F039, multi-source leachate, sampling or analysis methods |
1 |
c. To incorporate changes associated with underlying
hazardous constituents in ignitable or corrosive |
11 |
d. Other changes |
2 |
2. Changes to analytical quality assurance/control plan: |
|
a. To conform with agency guidance or rules |
1 |
b. Other changes |
2 |
3. Changes in procedures for maintaining the operating record |
1 |
4. Changes in frequency or content of |
2 |
5. Changes in the training plan: |
|
a. That affect the type or decrease the amount of training given to employees |
2 |
b. Other changes |
1 |
6. Contingency plan: |
|
a. Changes in emergency procedures, i.e., spill or release response procedures |
2 |
b. Replacement with functionally equivalent equipment, upgrade, or relocate emergency equipment listed |
1 |
c. Removal of equipment from emergency equipment list |
2 |
d. Changes in name, address, or phone number of coordinators or other persons or agencies identified in the plan |
1 |
7. |
|
a. Changes that the CQA officer certifies in the operating record will provide equivalent or better certainty that the unit components meet the design specifications |
1 |
b. Other changes |
2 |
Note: If a |
|
C. Ground-Water Protection |
|
1. Changes to wells: |
|
a. Changes in the number, location, depth, or design
of upgradient or downgradient wells of permitted ground-water |
2 |
b. Replacement of an existing well that has been damaged or rendered inoperable, without change to location, design, or depth of the well |
1 |
2. Changes in ground-water sampling or analysis
procedures or |
11 |
3. Changes in statistical procedure for determining
whether a statistically significant change in ground-water quality between
upgradient and downgradient wells has occurred, with prior approval of the
|
11 |
4. Changes in point of compliance |
2 |
5. Changes in indicator parameters, hazardous constituents, or concentration limits, including ACLs: |
|
a. As specified in the groundwater protection standard |
3 |
b. As specified in the detection |
2 |
6. Changes to a detection |
2 |
7. Compliance |
|
a. Addition of compliance |
3 |
b. Changes to a compliance |
2 |
8. Corrective action program: |
|
a. Addition of a corrective action program as required by Subsection R315-264-99(h)(2) and Section R315-264-100 |
3 |
b. Changes to a corrective action program as required by Subsection R315-264-100(h), unless otherwise specified in this appendix |
2 |
D. |
|
1. Changes to the |
|
a. Changes in estimate of maximum extent of
operations or maximum inventory of |
11 |
b. Changes in the |
11 |
c. Changes in the expected |
11 |
d. Changes in procedures for decontamination of
|
11 |
e. Changes in approved |
2 |
f. Extension of the |
2 |
2. Creation of a new landfill unit as part of
|
3 |
3. Addition of the following new units to be used
temporarily for |
|
a. Surface impoundments |
3 |
b. Incinerators |
3 |
c. |
3 |
d. |
2 |
e. Tanks or containers, other than specified below |
2 |
f. Tanks used for neutralization, dewatering, phase
separation, or |
11 |
g. Staging piles |
2 |
E. Post- |
|
1. Changes in name, address, or phone number of
contact in post- |
1 |
2. Extension of post- |
2 |
3. Reduction in the post- |
3 |
4. Changes to the expected |
1 |
5. Changes in post- |
2 |
F. Containers |
|
1. Modification or addition of container units: |
|
a. Resulting in greater than 25% increase in the
|
3 |
b. Resulting in up to 25% increase in the |
2 |
c. Or |
11 |
2. |
|
a. Modification of a container unit without increasing the capacity of the unit |
2 |
b. Addition of a roof to a container unit without alteration of the containment system |
1 |
3. |
|
a. That require additional or different management
practices from those authorized in the |
3 |
b. That do not require additional or different
management practices from those authorized in the |
2 |
Note: See Subsection R315-270-42(g) for modification procedures to be used for the management of newly listed or identified wastes. |
|
4. |
|
a. That require addition of units or change in
|
11 |
b. That do not require the addition of units or a
change in the |
11 |
G. Tanks |
|
1. |
|
a. Modification or addition of tank units resulting
in greater than 25% increase in the |
3 |
b. Modification or addition of tank units resulting
in up to 25% increase in the |
2 |
c. Addition of a new tank that will operate for more
than 90 days using any of the following physical or chemical |
2 |
d. After prior approval of the |
11 |
e. Modification or addition of tank units or
|
11 |
2. Modification of a tank unit or secondary containment system without increasing the capacity of the unit |
2 |
3. Replacement of a tank with a tank that meets the design standards and has a capacity within +/-10% of the replaced tank provided |
1 |
-The capacity difference is no more than 1500 gallons, |
|
-The |
|
-The replacement tank meets the conditions in the
|
|
4. Modification of a tank management practice |
2 |
5. Management of different wastes in tanks: |
|
a. That require additional or different management
practices, tank design, different fire protection specifications, or
significantly different tank |
3 |
b. That do not require additional or different
management practices, tank design, different fire protection specifications, or
significantly different tank |
2 |
c. That require addition of units or change in
|
11 |
d. That do not require the addition of units or a
change in the |
1 |
Note: See Subsection R315-270-42(g) for modification procedures to be used for the management of newly listed or identified wastes. |
|
H. Surface Impoundments |
|
1. Modification or addition of surface impoundment
units that result in increasing the |
3 |
2. Replacement of a surface impoundment unit |
3 |
3. Modification of a surface impoundment unit without
increasing the |
2 |
4. Modification of a surface impoundment management practice |
2 |
5. |
|
a. That require additional or different management
practices or different design of the liner or leak detection system than
authorized in the |
3 |
b. That do not require additional or different
management practices or different design of the liner or leak detection system
than authorized in the |
2 |
c. That are wastes restricted from land |
1 |
d. That are residues from wastewater |
1 |
6. Modifications of unconstructed units to comply with Subsections R315-264-221(c) and R315-264-226(d), and Sections R315-264-222, and R315-264-223 |
11 |
7. Changes in response action plan: |
|
a. Increase in action leakage rate |
3 |
b. Change in a specific response reducing its frequency or effectiveness |
3 |
c. Other changes |
2 |
Note: See Subsection R315-270-42(g) for modification procedures to be used for the management of newly listed or identified wastes. |
|
I. Enclosed |
|
1. Modification or addition of |
|
a. Resulting in greater than 25% increase in the
|
3 |
b. Resulting in up to 25% increase in the |
2 |
2. Modification of |
2 |
3. Replacement of a |
1 |
4. Modification of a |
2 |
5. |
|
a. That require additional or different management practices or different design of the unit |
3 |
b. That do not require additional or different management practices or different design of the unit |
2 |
6. Conversion of an enclosed |
2 |
Note: See Subsection R315-270-42(g) for modification procedures to be used for the management of newly listed or identified wastes. |
|
J. Landfills and Unenclosed |
|
1. Modification or addition of landfill units that
result in increasing the |
3 |
2. Replacement of a landfill |
3 |
3. Addition or modification of a liner, leachate collection system, leachate detection system, run-off control, or final cover system |
3 |
4. Modification of a landfill unit without changing a liner, leachate collection system, leachate detection system, run-off control, or final cover system |
2 |
5. Modification of a landfill management practice |
2 |
6. Landfill different wastes: |
|
a. That require additional or different management practices, different design of the liner, leachate collection system, or leachate detection system |
3 |
b. That do not require additional or different management practices, different design of the liner, leachate collection system, or leachate detection system |
2 |
c. That are wastes restricted from land |
1 |
d. That are residues from wastewater |
1 |
7. Modifications of unconstructed units to comply with Subsection R315-264-251(c), Sections R315-264-252 and R315-264-253, Subsections R315-264-254(c) and R315-264-301(c), Section R315-264-302, Subsection R315-264-303(c), and Section R315-264-304 |
11 |
8. Changes in response action plan: |
|
a. Increase in action leakage rate |
3 |
b. Change in a specific response reducing its frequency or effectiveness |
3 |
c. Other changes |
2 |
Note: See Subsection R315-270-42(g) for modification procedures to be used for the management of newly listed or identified wastes. |
|
K. Land |
|
1. Lateral expansion of or other modification of a
land |
3 |
2. Modification of run-on control system |
2 |
3. Modify run-off control system |
3 |
4. Other modifications of land |
2 |
5. Management of different wastes in land |
|
a. That require a change in |
3 |
b. That do not require a change in |
2 |
Note: See Subsection R315-270-42(g) for modification procedures to be used for the management of newly listed or identified wastes. |
|
6. Modification of a land |
|
a. Increase rate or change method of |
3 |
b. Decrease rate of |
1 |
7. Modification of a land |
2 |
8. Modification of a land |
3 |
9. Modification of operating practice due to
detection of releases from the land |
3 |
10. Changes in the unsaturated zone |
3 |
11. Changes in the unsaturated zone |
2 |
12. Changes in background values for hazardous constituents in soil and soil-pore liquid |
2 |
13. Changes in sampling, analysis, or statistical procedure |
2 |
14. Changes in land |
2 |
15. Changes in any condition specified in the |
11 |
16. Changes to allow a second land |
11 |
17. Changes to allow a second land |
3 |
18. Changes in vegetative cover requirements for
|
2 |
L. Incinerators, Boilers, and Industrial Furnaces: |
|
1. Changes to increase by more than 25% any of the
following limits authorized in the |
3 |
2. Changes to increase by up to 25% any of the
following limits authorized in the |
2 |
3. Modification of an incinerator, boiler, or
industrial furnace unit by changing the internal size or geometry of the
primary or secondary combustion units, by adding a primary or secondary
combustion unit, by substantially changing the design of any |
3 |
4. Modification of an incinerator, boiler, or
industrial furnace unit in a manner that would not likely affect the capability
of the unit to meet the regulatory performance standards but that would change
the operating conditions or |
2 |
5. Operating requirements: |
|
a. Modification of the limits specified in the |
3 |
b. Modification of any stack gas emission limits
specified in the |
3 |
c. Modification of any other operating condition or
any |
2 |
6. Burning different wastes: |
|
a. If the |
3 |
b. If the |
2 |
Note: See Subsection R315-270-42(g) for modification procedures to be used for the management of newly listed or identified wastes. |
|
7. Shakedown and trial burn: |
|
a. Modification of the trial burn plan or any of the
|
2 |
b. Authorization of up to an additional 720 hours of
|
11 |
c. Changes in the operating requirements set in the
|
11 |
d. Changes in the ranges of the operating
requirements set in the |
11 |
8. Substitution of an alternative type of
nonhazardous |
1 |
9. Technology changes needed to meet standards under
40 CFR part 63, Subpart EEE-National Emission Standards for Hazardous Air
Pollutants From |
11 |
10. Changes to |
|
M. Containment Buildings. |
|
1. Modification or addition of containment building units: |
|
a. Resulting in greater than 25% increase in the
|
3 |
b. Resulting in up to 25% increase in the |
2 |
2. Modification of a containment building unit or secondary containment system without increasing the capacity of the unit |
2 |
3. Replacement of a containment building with a containment building that meets the design standards provided: |
|
a. The unit capacity is not increased |
1 |
b. The replacement containment building meets the
conditions in the |
1 |
4. Modification of a containment building management practice |
2 |
5. |
|
a. That require additional or different management practices |
3 |
b. That do not require additional or different management practices |
2 |
N. Corrective Action: |
|
1. Approval of a |
3 |
2. Approval of a temporary unit or time extension for a temporary unit pursuant to Section R315-264-553 |
2 |
3. Approval of a staging pile or staging pile operating term extension pursuant to Section R315-264-554 |
2 |
O. Burden Reduction |
|
1. Reserved |
|
2. Development of one contingency plan based on Integrated Contingency Plan Guidance pursuant to Subsection R315-264-52(b) |
1 |
3. Changes to recordkeeping and reporting requirements pursuant to: Subsections R315-264-56(i), R315-264-343(a)(2), R315-264-1061(b)(1),(d), R315-264-1062(a)(2), R315-264-196(f), R315-264-100(g), and R315-264-113(e)(5) |
1 |
4. Changes to |
1 |
5. Changes to detection and compliance |
1 |
1Class 1 modifications requiring prior Agency approval.
Notes