Utah Admin. Code R315-270-63 - Hazardous Waste Permit Program - Permits for Land Treatment Demonstrations Using Field Test or Laboratory Analyses
(a) For the purpose of allowing an owner or
operator to meet the treatment demonstration requirements of Section
R315-264-272,
the Director may issue a treatment demonstration permit. The permit shall
contain only those requirements necessary to meet the standards in Subsection
R315-264-272(c).
The permit may be issued either as a treatment or disposal permit covering only
the field test or laboratory analyses, or as a two-phase facility permit
covering the field tests, or laboratory analyses, and design, construction
operation and maintenance of the land treatment unit.
(1) The Director may issue a two-phase
facility permit if the Director finds that, based on information submitted in
part B of the application, substantial, although incomplete or inconclusive,
information already exists upon which to base the issuance of a facility
permit.
(2) If the Director finds
that not enough information exists upon which the Director can establish permit
conditions to attempt to provide for compliance with all of the requirements of
Sections
R315-264-270
through 283, he shall issue a treatment demonstration permit covering only the
field test or laboratory analyses.
(b) If the Director finds that a phased
permit may be issued, the Director shall establish, as requirements in the
first phase of the facility permit, conditions for conducting the field tests
or laboratory analyses. These permit conditions shall include design and
operating parameters, including the duration of the tests or analyses and, in
the case of field tests, the horizontal and vertical dimensions of the
treatment zone; monitoring procedures; post-demonstration clean-up activities;
and any other conditions which the Director finds may be necessary under
Subsection
R315-264-272(c).
The Director shall include conditions in the second phase of the facility
permit to attempt to meet all Sections
R315-264-270
through 283 requirements pertaining to unit design, construction, operation,
and maintenance. The Director shall establish these conditions in the second
phase of the permit based upon the substantial but incomplete or inconclusive
information contained in the part B application.
(1) The first phase of the permit shall be
effective as provided in Subsection
R315-124-15(b).
(2) The second phase of the permit shall be
effective as provided in Subsection R315-270-63(d).
(c) When the owner or operator who has been
issued a two-phase permit has completed the treatment demonstration, the owner
or operator shall submit to the Director a certification, signed by a person
authorized to sign a permit application or report under Section
R315-270-11,
that the field tests or laboratory analyses have been carried out in accordance
with the conditions specified in phase one of the permit for conducting such
tests or analyses. The owner or operator shall also submit all data collected
during the field tests or laboratory analyses within 90 days of completion of
those tests or analyses unless the Director approves a later date.
(d) If the Director determines that the
results of the field tests or laboratory analyses meet the requirements of
Section
R315-264-272,
the Director shall modify the second phase of the permit to incorporate any
requirements necessary for operation of the facility in compliance with
Sections
R315-264-270
through 283, based upon the results of the field tests or laboratory analyses.
(1) This permit modification may proceed
under Section
R315-270-42,
or otherwise shall proceed as a modification under Subsection
R315-270-41(a)(2).
If such modifications are necessary, the second phase of the permit shall
become effective only after those modifications have been made.
(2) If no modifications of the second phase
of the permit are necessary, the Director shall give notice of the final
decision to the permit applicant and to each person who submitted written
comments on the phased permit or who requested notice of the final decision on
the second phase of the permit. The second phase of the permit then will become
effective as specified in Subsection
R315-124-15(b).