Utah Admin. Code R315-310-1 - Applicability
(1) Solid waste facilities subject to the
requirements of Rules R315-301 through R315-322 require a permit as follows:
(a) The following solid waste facilities are
subject to the requirements of Sections
R315-310-2 through
R315-310-12:
(i) New and existing Class I, II, III, I V,
V, VI, VII, and coal combustion residual (CCR) Landfills and coal combustion
residual surface impoundments;
(ii)
Class I, II, III, I V, V, VI, and VII Landfills that have closed but have not
met the requirements of Subsection
R315-302-3(7);
(iii) incinerator facilities that are
regulated by Rule R315-306;
(iv)
landtreatment disposal facilities that are regulated by Rule
R315-307;
(v) waste tire storage
facilities; and
(vi) solid waste
surface impoundments that are regulated by Rule R315-322.
(b) Solid waste facilities not listed in
Subsection R315-310-1(1)(a)
are subject to the permitting requirements of Sections
R315-310-2,
R315-310-3,
R315-310-9, and
R315-310-11.
(c) The following solid waste facilities are
subject to Subsection
R315-310-1(b)
and the post-closure permit requirements of Section
R315-310-10:
(i) compost facilities; and
(ii) waste piles, if post-closure monitoring
is required under Subsection
R315-314-2(f)(ii).
(2) Permits are not required for corrective
actions at solid waste facilities performed by the state or in conjunction with
the United States Environmental Protection Agency or in conjunction with
actions to implement the Comprehensive Environmental Response Compensation and
Liability Act of 1980 (CERCLA), or corrective actions taken by others to comply
with a state or federal cleanup order.
(3) The requirements of Sections
R315-310-2 through
R315-310-12 apply to each
existing and new solid waste facility as indicated.
(a) The director may incorporate a compliance
schedule for each existing facility to ensure that the owner or operator, or
both, of each existing facility meet the requirements of Rule
R315-310.
(b) The owner or
operator, or both, if the owner and operator are not the same person, of each
new facility or expansion at an existing solid waste facility, for which a
permit is required, shall:
(i) apply for a
permit according to the requirements of Rule R315-310;
(ii) not begin the construction or the
expansion of the solid waste facility until a permit has been granted;
and
(iii) not accept waste at the
solid waste facility before receiving the approval required by Subsection
R315-301-5(1).
(4) A landfill may not change from its
current class, or subclass, to any other class, or subclass, of landfill except
by meeting each requirement for the desired class, or subclass, to include
getting a new permit from the director for the desired class, or subclass, of
landfill.
(5) Any facility that is
in operation when a permit is required for the facility by Subsection
R315-310-1(1)
and has submitted a permit application within six months of the date the
facility became subject to the permit requirements of Subsection
R315-310-1(1)
may continue to operate during the permit review period but shall meet the
applicable requirements of Rules R315-301 through R315-322 unless an
alternative requirement has been approved by the director.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.