Utah Admin. Code R315-319-1 - Permit Required
(a) All landfills
disposing of coal combustion residuals and surface impoundments containing coal
combustion residuals shall have a permit for a Class I, II, or V landfill in
accordance with Rules R315-302 through 307 or a coal combustion residuals
permit issued under Rule R315-319.
(b) An application for a permit for a coal
combustion residual landfill or surface impoundment or multiple landfills and
impoundments at a facility covered by one permit shall be made to the
Director.
(c)
(1) An application for a permit a Coal
Combustion Residue (CCR) unit shall contain the information required in
Sections R315-319-60 through 107. No information need be submitted for which
the effective date in Sections R315-319-60 through 107 has not been reached at
the time of application submittal.
(2) All information required in Sections
R315-319-60 through 107 with an effective date that falls later that the
application submittal required in Subsection R315-319-1(c)(1) shall be
submitted within six months of the effective date of the requirement found in
Sections R315-319-60 through 107.
(d) Permit application procedures shall
follow the requirements of Sections
R315-310-1 and
2.
(e) Permit transfers shall
follow the procedures of Section
R315-310-11.
(f) Permit applicants shall follow the
notification requirements of Subsection
R315-310-3(2).
(g) Permit approvals shall follow the
requirements of Rule R315-311.
(h)
The Director approvals required in Sections R315-319-60 through 107 are
satisfied by the issuance of a permit by the Director.