Utah Admin. Code R432-5-14 - Mechanical Standards
(1) Mechanical
tests shall be conducted before final Department construction
inspection.
(2) Written test
results shall be retained in facility maintenance files and available for
Department review.
(3) Air
Conditioning, Heating, and Ventilating Systems shall include:
(a) a heating system capable of maintaining a
temperature of 80 degrees Fahrenheit in areas occupied by residents;
and
(b) a cooling system capable of
maintaining a temperature of 72 degrees Fahrenheit in areas occupied by
residents.
(4) Plumbing
and other Piping Systems shall include:
(a)
handwashing facilities that are arranged to provide sufficient clearance for
single lever operating handles;
(b)
kitchen grease traps that are located and arranged to permit access without the
need to enter food preparation or storage areas; and
(c) hot water provided in patient tubs,
showers, whirlpools, and handwashing facilities that is regulated by
thermostatically controlled automatic mixing valves. These valves may be
installed on the recirculating system or on individual inlets to
appliances.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.