Utah Admin. Code R649-3-11 - Directional Drilling
1. Except for the
tolerances allowed under Subsection
R649-3-10, no well may be
intentionally deviated unless the operator shall first file application and
obtain approval from the division.
1.1. An
application for directional drilling may be approved by the division without
notice and hearing when the applicant is the owner of any oil and gas within a
radius of 460 feet from any points along the intended well bore, or the
applicant has obtained the written consent of the owner to the proposed
directional drilling program.
1.2.
An application pertaining to a well with a surface location outside the
tolerances allowed by Subsection
R649-3-2 or the appropriate
board order, but with the point of penetration of the targeted productive zone
and bottom hole location within said tolerances, may be approved by the
division without notice and hearing conditioned upon the operator filing a
certification included with the application that it will not perforate and
complete the well in any other zone outside of said tolerances without
complying with the requirements of Subsection R649-3-11.1.1. Under these
circumstances, no additional exception location approval under Subsection
R649-3-3 is required.
1.3. An application for directional drilling
may be included as part of the initial APD for a proposed
well.
2. An application
for directional drilling shall include the following information:
2.1. The name and address of the
operator.
2.2. The lease name, well
number, field name, reservoir name, and county where the proposed well is
located.
2.3. A plat or sketch
showing the distance from the surface location to section and lease lines, the
target location within the intended producing interval, and any point along the
intended well bore outside the 460 foot radius for which the consent of the
owner has been obtained.
2.4. The
reason for the intentional deviation.
2.5. The signature of designated agent or
representative of operator.
3. Within 30 days following completion of a
directionally drilled well, a complete angular deviation and directional survey
of the well obtained by an approved well survey company shall be filed with the
division, together with other regularly required reports.