Utah Admin. Code R746-312-2 - Definitions
(1) "Adverse system
impact" means the negative effects due to technical or operational limits on
conductors or equipment being exceeded that may compromise the safety and
reliability of the electric distribution system.
(2) "Affected system" means an electric
system other than a public utility's electric distribution system that may be
affected by the proposed interconnection.
(3) "Building code official" means the city
or local official whose responsibility includes inspecting facilities for
compliance with the city or local jurisdiction electrical code
requirements.
(4) "Business day"
means Monday through Friday, excluding Federal holidays.
(5) "Confidential information" means any
confidential or proprietary information provided by one party to the other
party that is clearly marked or otherwise designated "Confidential." For this
rule, the design, operating specification, and metering data provided by the
interconnection customer shall be considered confidential information
regardless of whether it is clearly marked or otherwise designated as
confidential information. Confidential information does not include information
previously in the public domain, required to be publicly submitted or divulged
by governmental authorities, or necessary to be divulged in an action to
enforce these procedures.
(6)
"Electric distribution system" means that portion of an electric system that
delivers electricity from transformation points on the transmission system to
the point or points of connection at a customer's premises.
(7) "Equipment package" means, for
certification purposes, a group of components connecting a generating
facility's device for the production of electricity, in other words, a
generator, with an electric distribution system, and includes any interface
equipment including switchgear, inverters, or other interface devices. An
equipment package may include an integrated generator or electric production
source. An equipment package does not include equipment provided by the
utility.
(8) "Fault current" means
electrical current that flows through a circuit and is produced by an
electrical fault, for example, to ground, double-phase to ground, three-phase
to ground, phase-to-phase, and three-phase. A fault current is several times
larger in magnitude than the current that normally flows through a
circuit.
(9) "Facilities study"
means a study conducted to determine the additional or upgraded distribution
system facilities necessary to interconnect a generating facility with a public
utility, the cost of those facilities, and the time schedule required to
interconnect the generating facility to the public utility's distribution
system.
(10) "Feasibility study"
means a preliminary evaluation of the system impact and the cost of
interconnecting a generating facility to the public utility's electric
distribution system.
(11)
"Generating facility" means the interconnection customer's device for the
production of electricity and each associated component up to the point of
common coupling identified in the interconnection request but may not include
the interconnection customer's interconnection facilities.
(12) "Generation capacity" means the
nameplate capacity of the power generating device of a generating facility.
Generation capacity does not include the effects caused by inefficiencies of
power conversion or plant parasitic loads.
(13) "Good utility practice" means any of the
practices, methods, and acts engaged in or approved by a significant portion of
the electric utility industry during the relevant time period, or any of the
practices, methods, and acts that, in the exercise of reasonable judgment in
light of the facts known when the decision was made, could have been expected
to accomplish the desired result of the lowest reasonable cost consistent with
good business practices, reliability, safety, and expedition. Good utility
practice is not intended to be limited to the optimum practice, method, or act
to the exclusion of any others, but rather to be acceptable practices, methods,
or acts generally accepted in the region and consistently adhered to by the
public utility.
(14) "Governing
authority" means:
(a) for a distribution
electrical cooperative, its board of directors; and
(b) for each other electrical corporation,
the Public Service Commission, otherwise referred to as the
commission.
(15) "IEEE
standards" means the Institute of Electrical and Electronics Engineers (IEEE)
Interconnecting Distributed Resources with Electric Power Systems -- IEEE 1547
Series referenced in Section
54-15-102.
(16) "Interconnection agreement" means a
standard form agreement between an interconnection customer and a public
utility that governs the connection of a generating facility to the electric
distribution system and the ongoing operation of the generating facility after
it is connected to the system.
(17)
"Interconnection customer" means any entity including a public utility that
proposes to interconnect its generating facility with the public utility's
distribution system.
(18)
"Interconnection facilities" means the facilities and equipment required by a
public utility to accommodate the interconnection of a generating facility to
the public utility's electric distribution system and used exclusively for that
interconnection. Interconnection Facilities do not include upgrades.
(19) "Interconnection request" means the
interconnection customer's request to interconnect a new generating facility,
or to increase the capacity of, or make a material modification to the
operating characteristics of an existing generating facility that is
interconnected with the public utility. The interconnection request includes
the required applications, forms, processing fees, and deposits required by the
public utility.
(20) "Inverter" has
the same meaning as in Section
54-15-102.
(21) "Level 1 interconnection review" means
an interconnection review process applicable to an inverter-based facility
having a generation capacity of 25 kilowatts or less.
(22) "Level 2 interconnection review" means
an interconnection review process applicable to a facility having a generation
capacity of 2 megawatts or less and that does not qualify for or fails to meet
Level 1 interconnection review requirements.
(23) "Level 3 interconnection review" means
an interconnection review process applicable to a facility having a generation
capacity of greater than 2 megawatts but no larger than 20 megawatts, the
generating facility is not certified, or the generating facility does not
qualify for or fails to meet Level 1 or Level 2 interconnection review
requirements.
(24) "Net metering
facility" means a facility eligible for net metering, or an eligible facility
as defined in Section 54-15-102.
(25) "Party or parties" means the public
utility, the interconnection customer, or both.
(26) "Point of common coupling" means the
point at which the interconnection between the public utility's system and the
interconnection customer's equipment interface occurs. Typically, this is the
customer side of the public utility's meter.
(27) "Public utility" has the meaning set
forth in Section
54-2-1 and is limited to a public
utility that provides electric service.
(28) "Queue position" means the order of a
valid interconnection request relative to any other pending valid
interconnection requests that is established based upon the date and time of
receipt of a completed interconnection request, including application fees, by
the public utility.
(29) "Spot
network" means a type of electric distribution system that uses two or more
inter-tied transformers protected by network protectors to supply an electrical
network circuit. A spot network is generally used to supply power to a single
customer or a small group of customers.
(30) "Standard form" or "standard form
agreement" means a form or agreement that follows that adopted or approved by
the Federal Energy Regulatory Commission in its small generator interconnection
proceedings and modified to be consistent with this rule unless the governing
authority has approved an alternative form or agreement.
(31) "Switchgear" has the same meaning as in
Section 54-15-102.
(32) "System impact study" means an
engineering analysis of the probable impact of a generating facility on the
safety and reliability of the public utility's electric distribution
system.
(33) "Telemetry" means the
remote communication from a generator facility to a point on the public
utility's communication network where the data may be assimilated into the
public utility's grid operations if desired.
(34) "UL1741" means the UL Standard for
Inverters, Converters, Controllers and Interconnection System Equipment for Use
With Distributed Energy Resources as referenced in Section 54-15-102.
(35) "Upgrades" means the required additions
and modifications to a public utility's distribution system beyond the point of
interconnection. Upgrades do not include interconnection facilities.
(36) "Written notice" means a required notice
sent by the utility via electronic mail if the interconnection customer has
provided an electronic mail address. If the interconnection customer has not
provided an electronic mail address, or has requested in writing to be notified
by United States mail, or if the utility elects to provide notice by United
States mail, then written notices from the utility shall be sent via First
Class United States mail. The utility shall be considered to have fulfilled its
duty to respond under this rule on the day it sends the interconnection
customer notice via electronic mail or deposits the notice in First Class mail.
The interconnection customer shall be responsible for informing the utility of
any changes to its notification address.