Utah Admin. Code R746-313-7 - Reporting on Electric Service Reliability
(1) An electric company must report
deviations from the reliability performance baselines established in accordance
with Section R746-313-4 within 60 days after
the end of the month when the deviations occurred.
(2) Beginning May 1, 2013, and by May 1 of
each succeeding year, an electric company whose governing authority is the
commission shall file with the commission a report on electric service
reliability for the previous calendar year. The electric company must make
electronic copies of the report available to the public upon request and may
charge a reasonable cost for requested paper copies.
(3) For an electric company whose governing
authority is the commission, the report on electric service reliability must
contain at least:
(a) the calculated SAIDI,
SAIFI, CAIDI, and MAIFIe reliability indices for the reporting period. At the
least, the electric company must report this information on a system-wide basis
compared with the previous four years' performance and, for SAIDI, SAIFI, and
CAIDI on an operating area compared with the previous four years'
performance;
(b) an analysis of the
system-wide and reliability reporting area sustained interruption causes
compared to the previous four-year performance. Outages may be categorized
using the following cause categories:
(i) Loss
of Supply - Generation or Transmission;
(ii) Loss of Supply - Distribution
Substation;
(iii) Distribution -
Environment such as: unpreventable contamination, corrosion, airborne deposits,
flooding, and fire or smoke not related to faults or lightning;
(iv) Distribution - Equipment
Failure;
(v) Distribution -
Lightning;
(vi) Distribution -
Operational;
(vii) Distribution -
Planned Outages;
(viii)
Distribution - Public;
(ix)
Distribution - Vegetation;
(x)
Distribution - Weather, other than lightning;
(xi) Distribution - Wildlife;
(xii) Distribution - Unknown; and
(xiii) Distribution - Other;
(c) a listing of the major events
experienced during the reporting period and a listing of significant events as
defined by the electric company, their cause, and their effect on reliability
performance during the reporting period;
(d) comparisons of budgeted and actual
maintenance spending, maintenance activities, capital spending, vegetation
management spending, and vegetation management activities;
(e) identification of areas whose reliability
performance warrants additional improvement efforts;
(f) a listing of the Tmed values that will be
used for each reliability reporting area for the forthcoming annual reporting
period;
(g) a summary of the
changes the electric company has made or will make pertaining to the
collection, calculation, estimation, and reporting of electric service
reliability information and changes in reliability reporting areas or operating
areas; and
(h) a map showing the
reliability reporting areas or operating areas.