Utah Admin. Code R916-3-3 - Policy

(1) UDOT may use, where determined appropriate by the Executive Director, or designee, the Design-Build method of project delivery. When Design-Build is used, UDOT shall enter into a contract with a single entity to provide both engineering/design services, construction services, and/or maintenance services pursuant to a UDOT provided scope of work statement. Design-Build is not recommended for every project. The use of the Design-Build method may be determined by the individual needs and merits of the project.

Notes

Utah Admin. Code R916-3-3
Amended by Utah State Bulletin Number 2015-8, effective 3/27/2015

State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.


No prior version found.