Wash. Admin. Code § 246-359-210 - Treated wood foundations for wood framed construction
(1) All lumber and plywood used for wood
foundation systems must be pressure treated and bear the grade mark FDN
(foundation grade) or better.
(2)
Where FDN lumber and plywood is cut or drilled after treatment, the cut surface
must be field treated with a preservative that is designated for that
purpose.
(3) Hot-dipped zinc-coated
steel nails or stainless steel fasteners will be used as fasteners for treated
wood foundation walls. Electrogalvanized nails or staples and hot-dipped
zinc-coated staples cannot be used.
(4) Treated wood foundations must have
composite footings consisting of a minimum two-by-eight lumber footing plate
set eighteen inches below finished grade on top of a layer of gravel, coarse
sand or crushed stone. The gravel, sand, or crushed stone footing will have a
width of not less than sixteen inches and a depth of not less than six inches,
and must be placed in firm, undisturbed soil.
(5) The gravel, sand, or crushed stone
footing must consist of:
(a) Washed and
graded gravel free from organic, clayey or silty soils with a maximum stone
size not exceeding three-fourths inch;
(b) Coarse sand free from organic, clayey, or
silty soils with a minimum grain size of one-sixteenth inch; or
(c) Crushed stone with a maximum size of
one-half inch.
(6)
Treated wood foundation walls must be constructed of two-by-six studs at a
minimum of sixteen inches on center with a double two-by-six top plate. Cover
the studs with a minimum one-half inch thick pressure treated exterior plywood
sheathing placed on the exterior of the studs. Treated wood foundation walls
will not be greater than forty-eight inches measured from the bottom of the
footing plate to the top of the double top plate.
(7) Joints in the footing plate and top
plates must be staggered at least one stud space. Framing at locations where
openings occur in the wall and floor systems above, and at other points of
concentrated loads must have studs added at those points to support the
concentrated loads.
(8) Before
backfilling, cover the gravel, sand, or crushed stone appearing outside the
treated wood foundation wall with strips of six-mil thick polyethylene
sheeting, Type 30 felt, or equivalent material with adjacent strips lapped to
provide for water seepage while preventing excessive infiltration of fine
soils.
(9) Backfill on the outside
to eight inches or more below the top of the treated wood foundation walls.
Backfill on the inside of the treated wood foundation walls (crawl space) a
minimum depth of six inches above the top of the footing plate.
Notes
Statutory Authority: RCW 70.114A.081. 99-03-065, § 246-359-210, filed 1/18/99, effective 2/18/99.
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.