Wis. Admin. Code Department of Administration § Adm 20.04 - Selection procedures

(1) When selecting an architect/engineer for a project when the estimated project cost is less than $5,000,000, the selection committee may utilize the simplified selection by nomination procedure specified in s. Adm 20.05.
(2) When selecting an architect/engineer for a project that has an estimated project cost of $5,000,000 or more, the selection committee shall require the more detailed procedure for selection by advertisement, review and interview as specified in ss. Adm 20.06, 20.07 and 20.08.

Notes

Wis. Admin. Code Department of Administration § Adm 20.04
Cr. Register, August, 1979, No. 284, eff. 9-1-79; CR 05-069: am. (1) and (2) Register May 2006 No. 605, eff. 6-1-06.