10 U.S. Code § 2305a - Design-build selection procedures
A prior section 2305a was renumbered section 2438 of this title.
2019—Subsec. (d)(1). Pub. L. 116–92 substituted “an indefinite” for “a indefinite”.
2017—Subsec. (d). Pub. L. 115–91 substituted “If the contract value exceeds $4,000,000, the maximum number specified in the solicitation shall not exceed 5 unless—” and pars. (1) and (2) for “If the contract value exceeds $4,000,000, the maximum number specified in the solicitation shall not exceed 5 unless the head of the contracting activity, delegable to a level no lower than the senior contracting official within the contracting activity, approves the contracting officer’s justification with respect to an individual solicitation that a number greater than 5 is in the Federal Government’s interest. The contracting officer shall provide written documentation of how a maximum number exceeding 5 is consistent with the purposes and objectives of the two-phase selection procedures.”
2014—Subsec. (d). Pub. L. 113–291 substituted “If the contract value exceeds $4,000,000, the maximum number specified in the solicitation shall not exceed 5 unless the head of the contracting activity, delegable to a level no lower than the senior contracting official within the contracting activity, approves the contracting officer’s justification with respect to an individual solicitation that a number greater than 5 is in the Federal Government’s interest. The contracting officer shall provide written documentation of how a maximum number exceeding 5 is consistent with the purposes and objectives of the two-phase selection procedures.” for “The maximum number specified in the solicitation shall not exceed 5 unless the agency determines with respect to an individual solicitation that a specified number greater than 5 is in the Government’s interest and is consistent with the purposes and objectives of the two-phase selection process.”
2006—Subsec. (f)(2). Pub. L. 109–163, § 2807(a), amended par. (2) generally. Prior to amendment, par. (2) read as follows: “Any military construction contract that provides for an accelerated design effort, as authorized by paragraph (1), shall include as a condition of the contract that the liability of the United States in a termination for convenience may not exceed the actual costs incurred as of the termination date.”
Subsec. (f)(4). Pub. L. 109–163, § 2807(b), substituted “2008” for “2007” wherever appearing.
2004—Subsec. (f). Pub. L. 108–375 added subsec. (f).
2003—Subsec. (c)(1). Pub. L. 108–178 substituted “chapter 11 of title 40” for “the Brooks Architect-Engineers Act (40 U.S.C. 541 et seq.)”.
2002—Subsec. (a). Pub. L. 107–217 substituted “chapter 11 of title 40” for “the Brooks Architect-Engineers Act (40 U.S.C. 541 et seq.)”.
1997—Subsec. (a). Pub. L. 105–85 substituted “(40 U.S.C.” for “(41 U.S.C.”.
Amendment by Pub. L. 108–178 effective Aug. 21, 2002, see section 5 of Pub. L. 108–178, set out as a note under section 5334 of Title 5, Government Organization and Employees.
For effective date and applicability of section, see section 4401 of Pub. L. 104–106, set out as an Effective Date of 1996 Amendment note under section 2302 of this title.