The Secretary of Defense shall ensure, to the maximum extent practicable, that the Department of Defense, before selecting a contractor for the engineering and manufacturing development of a major weapon system, production of a major weapon system, or sustainment of a major weapon system, negotiates a price for technical data to be delivered under a contract for such development, production, or sustainment.
10 U.S. Code § 4236 - Negotiation of price for technical data before development, production, or sustainment of major weapon systems
2021—Pub. L. 116–283 renumbered section 2439 of this title as this section.
2018—Pub. L. 115–232, § 867(4), substituted “, production, or sustainment” for “or production” in section catchline.
Pub. L. 115–232, § 867(1)–(3), inserted “, to the maximum extent practicable,” after “shall ensure” and substituted “production of a major weapon system, or sustainment of a major weapon system” for “or for the production of a major weapon system” and “, production, or sustainment” for “or production”.
Amendment by Pub. L. 116–283 effective Jan. 1, 2022, with additional provisions for delayed implementation and applicability of existing law, see section 1801(d) of Pub. L. 116–283, set out as a note preceding section 3001 of this title.
Pub. L. 115–91, div. A, title VIII, § 835(a)(3), Dec. 12, 2017, 131 Stat. 1471, provided that: