10 U.S. Code § 8671 - Determination of vessel delivery dates
2018—Pub. L. 115–232, § 807(d)(2), renumbered section 7301 of this title as this section.
Subsec. (c). Pub. L. 115–232, § 1014(a)(2), added subsec. (c). Former subsec. (c) redesignated (d).
Subsec. (d). Pub. L. 115–232, § 1014(b), added subsec. (d) and struck out former subsec. (d). Prior to amendment, text read as follows: “In this section, the term ‘covered vessel’ means any vessel of the Navy that is under construction on or after the date of the enactment of this section using amounts authorized to be appropriated for the Department of Defense for shipbuilding and conversion, Navy.”
Pub. L. 115–232, § 1014(a)(1), redesignated subsec. (c) as (d).
Amendment by section 807(d)(2) of Pub. L. 115–232 effective Feb. 1, 2019, with provision for the coordination of amendments and special rule for certain redesignations, see section 800 of Pub. L. 115–232, set out as a note preceding section 3001 of this title.
Pub. L. 114–328, div. A, title I, § 121(b), Dec. 23, 2016, 130 Stat. 2030, provided that: