§ 250.730 What are the general requirements for BOP systems and system components?

(a) You must ensure that the BOP system and system components are designed, installed, maintained, inspected, tested, and used properly to ensure well control. The working-pressure rating of each BOP component (excluding annular(s)) must exceed MASP as defined for the operation. For a subsea BOP, the MASP must be taken at the mudline. The BOP system includes the BOP stack, control system, and any other associated system(s) and equipment. The BOP system and individual components must be able to perform their expected functions and be compatible with each other. Your BOP system (excluding casing shear) must be capable of closing and sealing the wellbore at all times, including under anticipated flowing conditions for the specific well conditions, without losing ram closure time and sealing integrity due to the corrosiveness, volume, and abrasiveness of any fluids in the wellbore that the BOP system may encounter. Your BOP system must meet the following requirements:

(1) The BOP requirements of API Standard 53 (incorporated by reference in § 250.198) and the requirements of §§ 250.733 through 250.739. If there is a conflict between API Standard 53, and the requirements of this subpart, you must follow the requirements of this subpart.

(2) Those provisions of the following industry standards (all incorporated by reference in § 250.198) that apply to BOP systems:

(i) ANSI/API Spec. 6A;

(ii) ANSI/API Spec. 16A;

(iii) ANSI/API Spec. 16C;

(iv) API Spec. 16D; and

(v) ANSI/API Spec. 17D.

(3) For surface and subsea BOPs, the pipe and variable bore rams installed in the BOP stack must be capable of effectively closing and sealing on the tubular body of any drill pipe, workstring, and tubing (excluding tubing with exterior control lines and flat packs) in the hole under MASP, as defined for the operation, with the proposed regulator settings of the BOP control system.

(4) The current set of approved schematic drawings must be available on the rig and at an onshore location. If you make any modifications to the BOP or control system that will change your BSEE-approved schematic drawings, you must suspend operations until you obtain approval from the District Manager.

(b) You must ensure that the design, fabrication, maintenance, and repair of your BOP system is in accordance with the requirements contained in this part, Original Equipment Manufacturers (OEM) recommendations unless otherwise directed by BSEE, and recognized engineering practices. The training and qualification of repair and maintenance personnel must meet or exceed any OEM training recommendations unless otherwise directed by BSEE.

(c) You must follow the failure reporting procedures contained in API Standard 53, ANSI/API Spec. 6A, and ANSI/API Spec 16A (all incorporated by reference in § 250.198), and:

(1) You must provide a written notice of equipment failure to the Chief, Office of Offshore Regulatory Programs, and the manufacturer of such equipment within 30 days after the discovery and identification of the failure. A failure is any condition that prevents the equipment from meeting the functional specification.

(2) You must ensure that an investigation and a failure analysis are performed within 120 days of the failure to determine the cause of the failure. You must also ensure that the results and any corrective action are documented. If the investigation and analysis are performed by an entity other than the manufacturer, you must ensure that the Chief, Office of Offshore Regulatory Programs and the manufacturer receive a copy of the analysis report.

(3) If the equipment manufacturer notifies you that it has changed the design of the equipment that failed or if you have changed operating or repair procedures as a result of a failure, then you must, within 30 days of such changes, report the design change or modified procedures in writing to the Chief, Office of Offshore Regulatory Programs.

(4) You must send the reports required in this paragraph to: Chief, Office of Offshore Regulatory Programs; Bureau of Safety and Environmental Enforcement; 45600 Woodland Road, Sterling, VA 20166.

(d) If you plan to use a BOP stack manufactured after the effective date of this regulation, you must use one manufactured pursuant to an API Spec. Q1 (as incorporated by reference in § 250.198) quality management system. Such quality management system must be certified by an entity that meets the requirements of ISO 17011.

(1) BSEE may consider accepting equipment manufactured under quality assurance programs other than API Spec. Q1, provided you submit a request to the Chief, Office of Offshore Regulatory Programs for approval, containing relevant information about the alternative program.

(2) You must submit this request to the Chief, Office of Offshore Regulatory Programs; Bureau of Safety and Environmental Enforcement; 45600 Woodland Road, Sterling, Virginia 20166.

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


United States Code
U.S. Code: Title 30 - MINERAL LANDS AND MINING
U.S. Code: Title 31 - MONEY AND FINANCE
U.S. Code: Title 43 - PUBLIC LANDS

Title 30 published on 06-Jun-2018 04:01

The following are ALL rules, proposed rules, and notices (chronologically) published in the Federal Register relating to 30 CFR Part 250 after this date.

  • 2018-05-11; vol. 83 # 92 - Friday, May 11, 2018
    1. 83 FR 22128 - Oil and Gas and Sulfur Operations in the Outer Continental Shelf—Blowout Preventer Systems and Well Control Revisions
      GPO FDSys XML | Text
      DEPARTMENT OF THE INTERIOR, Bureau of Safety and Environmental Enforcement
      Proposed rule.
      Submit comments by July 10, 2018. BSEE may not fully consider comments received after this date. You may submit comments to the Office of Management and Budget (OMB) on the information collection burden in this proposed rule by June 11, 2018. The deadline for comments on the information collection burden does not affect the deadline for the public to comment to BSEE on the proposed regulations.
      30 CFR Part 250
The section you are viewing is cited by the following CFR sections.