30 CFR 250.733 - What are the requirements for a surface BOP stack?

§ 250.733 What are the requirements for a surface BOP stack?

(a) When you drill or conduct operations with a surface BOP stack, you must install the BOP system before drilling or conducting operations to deepen the well below the surface casing and after the well is deepened below the surface casing point. The surface BOP stack must include at least four remote-controlled, hydraulically operated BOPs, consisting of one annular BOP, one BOP equipped with blind shear rams, and two BOPs equipped with pipe rams.

(1) The blind shear rams must be capable of shearing at any point along the tubular body of any drill pipe (excluding tool joints, bottom-hole tools, and bottom hole assemblies that include heavy-weight pipe or collars), workstring, tubing provided that the capability to shear tubing with exterior control lines is not required prior to April 30, 2018, and any electric-, wire-, and slick-line that is in the hole and sealing the wellbore after shearing. If your blind shear rams are unable to cut any electric-, wire-, or slick-line under MASP as defined for the operation and seal the wellbore, you must use an alternative cutting device capable of shearing the lines before closing the BOP. This device must be available on the rig floor during operations that require their use.

(2) The two BOPs equipped with pipe rams must be capable of closing and sealing on the tubular body of any drill pipe, workstring, and tubing under MASP, as defined for the operation, except for tubing with exterior control lines and flat packs, a bottom hole assembly that includes heavy-weight pipe or collars, and bottom-hole tools.

(b) If you plan to use a surface BOP on a floating production facility you must:

(1) For BOPs installed after April 29, 2019, follow the BOP requirements in § 250.734(a)(1).

(2) For risers installed after July 28, 2016, use a dual bore riser configuration before drilling or operating in any hole section or interval where hydrocarbons are, or may be, exposed to the well. The dual bore riser must meet the design requirements of API RP 2RD (as incorporated by reference in § 250.198), including appropriate design for the maximum anticipated operating and environmental conditions.

(i) For a dual bore riser configuration, the annulus between the risers must be monitored for pressure during operations. You must describe in your APD or APM your annulus monitoring plan and how you will secure the well in the event a leak is detected.

(ii) The inner riser for a dual riser configuration is subject to the requirements at § 250.721 for testing the casing or liner.

(c) You must install separate side outlets on the BOP stack for the kill and choke lines. If your stack does not have side outlets, you must install a drilling spool with side outlets. The outlet valves must hold pressure from both directions.

(d) You must install a choke and a kill line on the BOP stack. You must equip each line with two full-bore, full-opening valves, one of which must be remote-controlled. On the kill line, you may install a check valve and a manual valve instead of the remote-controlled valve. To use this configuration, both manual valves must be readily accessible and you must install the check valve between the manual valves and the pump.

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


United States Code
U.S. Code: Title 30 - MINERAL LANDS AND MINING
U.S. Code: Title 31 - MONEY AND FINANCE
U.S. Code: Title 43 - PUBLIC LANDS
The section you are viewing is cited by the following CFR sections.