30 CFR 780.15 - What plans for the use of explosives must I include in my application?

§ 780.15 What plans for the use of explosives must I include in my application?

(a)Blasting plan. Each application must contain a blasting plan for the proposed permit area, explaining how you will comply with the requirements of §§ 816.61 through 816.68 of this chapter. This plan must include, at a minimum, information setting forth the limitations on ground vibration and airblast, the bases for those limitations, and the methods to be applied in controlling the adverse effects of blasting operations.

(b)Monitoring system. Each application must contain a description of any system to be used to monitor compliance with the standards of § 816.67 including the type, capability, and sensitivity of any blast-monitoring equipment and proposed procedures and locations of monitoring.

(c)Blasting near underground mines. Blasting operations within 500 feet of active underground mines require approval of the state and federal regulatory authorities concerned with the health and safety of underground miners.

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


United States Code
U.S. Code: Title 16 - CONSERVATION
U.S. Code: Title 30 - MINERAL LANDS AND MINING