Ariz. Admin. Code § R18-9-E303 - 4.03 General Permit: Composting Toilet, Less Than 3000 Gallons Per Day Design Flow A.
A. A 4.03
General Permit allows for the use of a composting toilet with less than 3000
gallons per day design flow
1. Definition.
For purposes of this Section, "composting toilet" means a manufactured turnkey
or kit form treatment technology that receives human waste from a waterless
toilet directly into an aerobic composting chamber where dehydration and
biological activity reduce the waste volume and the content of nutrients and
harmful microorganisms to an appropriate level for later disposal at the site
or by other means.
2. An applicant
may use a composting toilet if:
a. Limited
water availability prevents use of other types of on-site wastewater treatment
facilities,
b. Environmental
constraints prevent the discharge of wastewater or nutrients to a sensitive
area,
c. Inadequate space prevents
use of other systems,
d. Severe
site limitations exist that make other forms of treatment or disposal
unacceptable, or
e. The applicant
desires maximum water conservation.
3. A permittee may use a composting toilet
only if:
a. Wastewater is managed as provided
in this Section and, if gray water is separated and reused, the gray water
reuse complies with18 A.A.C. 9, Article 7; and
b. Soil conditions support subsurface
disposal of all wastewater sources.
B. Restrictions.
1. A permittee shall ensure that no more than
50 persons per day use the composting toilet.
2. A composting toilet shall only receive
human excrement unless the manufacturer's specifications allow the deposit of
kitchen or other wastes into the toilet.
C. Performance. An applicant shall ensure
that:
1. The composting toilet provides
containment to prevent the discharge of toilet contents to the native soil
except leachate, which may drain to the wastewater disposal works described in
subsection (F);
2. The composting
toilet limits access by vectors to the contained waste; and
3. Wastewater is disposed into the subsurface
to prevent any wastewater from surfacing.
D. Notice of Intent to Discharge. In addition
to the Notice of Intent to Discharge requirements specified in
R18-9-A301(B)
and R18-9-A309(B),
the applicant shall submit the following information:
1. Composting toilet.
a. The name and address of the composting
toilet system manufacturer;
b. A
copy of the manufacturer's warranty, and the specifications for installation
operation, and maintenance;
c. The
product model number;
d. Composting
rate, capacity, and waste accumulation volume calculations;
e. Documentation of listing by a national
listing organization indicating that the composting toilet meets the stated
manufacturer's specifications for loading, treatment performance, and
operation, unless the composting toilet is listed under
R18-9-A309(E) or
is a component of a reference design approved by the Department;
f. The method of vector control;
g. The planned method and frequency for
disposing the composted human excrement residue; and
h. The planned method for disposing of the
drainage from the composting unit; and
2. Wastewater.
a. The number of bedrooms in the dwelling or
persons served on a daily basis, as applicable, and the corresponding design
flow of the disposal works for the wastewater;
b. The results from soil evaluation or
percolation testing that adequately characterize the soils into which the
wastewater will be dispersed and the locations of soil evaluation and
percolation testing on the site plan; and
c. The design for the disposal works in
subsection (F), including the location of the interceptor, the location and
configuration of the trench or bed used for wastewater dispersal, the location
of connecting wastewater pipelines, and the location of the reserve area.
E. Design
requirements for a composting toilet. An applicant shall ensure that:
1. The composting chamber is watertight,
constructed of solid durable materials not subject to excessive corrosion or
decay, and is constructed to exclude access by vectors;
2. The composting chamber has airtight seals
to prevent odor or toxic gas from escaping into the building. The system may be
vented to the outside;
3. The
capacity of the chamber and rate of composting are calculated based on:
a. The lowest monthly average chamber
temperature; or
b. The yearly
average chamber temperature, if the composting toilet is designed to compost on
a yearly cycle or longer; and
4. The composting system provides adequate
storage of all waste produced during the months when the average temperature is
below 55oF, unless a temperature control device is
installed to increase the composting rate and reduce waste volume.
F. Design requirements
for the disposal works.
1. Interceptor. An
applicant shall ensure that the design complies with the following:
a.b. Wastewater passes
into an interceptor before it is conducted to the subsurface for dispersal;
b.c. The interceptor is
designed to remove grease, oil, fibers, and solids to ensure long-term
performance of the trench or bed used for subsurface dispersal;
c.d. The
interceptor is covered to restrict access and eliminate habitat for mosquitoes
and other vectors; and
d.e. Minimum interceptor
size is based on design flow.
a. An interceptor may not accept human
excreta or toilet wastewater;
i. For a
dwelling, the following apply:
|
No. of Bedrooms |
Design Flow (gallons per day) |
Minimum Interceptor Size (gallons) |
|
|
Kitchen Wastewater Only (All gray water sources are collected and reused) |
Combined Non-Toilet Wastewater (Gray water is not separated and reused) |
||
|
1 (7 fixture units or less) |
90 |
42 |
200 |
|
1-2 (greater than 7 fixture units) |
180 |
84 |
400 |
|
3 |
270 |
125 |
600 |
|
4 |
330 |
150 |
700 |
|
5 |
380 |
175 |
800 |
|
6 |
420 |
200 |
900 |
|
7 |
460 |
225 |
1000 |
ii.
For other than a dwelling, minimum interceptor size in gallons is 2.1 times the
design flow from Table 1, Unit Design Flows.
2. Dispersal of wastewater. An applicant
shall ensure that the design complies with the following:
a. A trench or bed is used to disperse the
wastewater into the subsurface;
b.
Sizing of the trench or bed is based on the design flow as determined in
subsection (F)(1)(e), including all black and gray water, and an SAR determined
under R18-9-A312(D);
c. The minimum vertical separation from the
bottom of the trench or bed to a limiting subsurface condition is at least 5
feet; and
d. Other aspects of
trench or bed design follow
R18-9-E302, as
applicable.
3. Setback
distances. Setback distances are no less than 1/4 of the setback distances
specified in
R18-9-A312(C),
but not less than 5 feet, except the setback distance from wells is 100
feet.
G. Operation and
maintenance requirements. A permittee shall:
1. Composting toilet.
a. Provide adequate mixing, ventilation,
temperature control, moisture, and bulk to reduce fire hazard and prevent
anaerobic conditions;
b. Follow
manufacturer's specifications for addition of any organic bulking agent to
control liquid drainage, promote aeration, or provide additional
carbon;
c. Follow the
manufacturer's specifications for operation and maintenance regarding movement
of material within the composting chamber;
d. If batch system containers are mounted on
a carousel, place a new container in the toilet area if the previous one is
full;
e. Ensure that only human
waste, paper approved for septic tank use, and the amount of bulking material
required for proper maintenance is introduced to the composting chamber. The
permittee shall remove all other materials or trash. If allowed by the
manufacturer's specifications the permittee may add, other nonliquid
compostable food preparation residues to the toilet;
f. Ensure that any liquid end product is:
i. Sprayed back onto the composting waste
material;
ii. Removed by a person
who licensed a vehicle under 18 A.A.C. 13, Article 11; or
iii. Is drained to the interceptor described
in subsection (F);
g.
Remove and dispose of composted waste as necessary, using a person who licensed
a vehicle under 18 A.A.C. 13, Article 11 if the waste is not placed in a
disposal area for burial or used on-site as mulch;
h. Before ending use for an extended period
take measures to ensure that moisture is maintained to sustain bacterial
activity and free liquids in the chamber do not freeze; and
i. After an extended period of non-use, empty
the composting chamber of solid end product and inspect all mechanical
components to verify that the mechanical components are operating as
designed;
2. Wastewater
Disposal Works.
a. Ensure that the interceptor
is maintained regularly according to manufacturer's instructions to prevent
grease and solid wastes from impairing performance of the trench or bed used
for dispersal of wastewater, and
b.
Protect the area of the trench or bed from soil compaction or other activity
that will impair dispersal performance.
H. Reference design.
1. An applicant may use a composting toilet
that achieves the performance requirements in subsection (C) by following a
reference design on file with the Department.
2. The applicant shall file a form provided
by the Department for supplemental information about the proposed system with
the applicant's submittal of the Notice of Intent to
Discharge.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.