Ariz. Admin. Code § R18-9-E311 - 4.11 General Permit: Peat Filter, Less Than 3000 Gallons Per Day Design Flow
A. A 4.11
General Permit allows for the use of a peat filter receiving wastewater treated
to a level equal to or better than that specified in
R18-9-E302(B) .
1. Definition. For purposes of this Section,
a "peat filter" means a disposal technology characterized by:
a. The dosed delivery of treated wastewater
to the peat bed, which can be a manufactured module or a disposal bed excavated
in native soil and filled with compacted peat;
b. Wastewater passing through the peat that
is further treated by removal of positively charged molecules, filtering, and
biological activity before entry into native soil; and
c. If the peat filter system is constructed
as a disposal bed filled with compacted peat, wastewater that is absorbed into
native soil at the bottom and sides of the bed.
2. An applicant may configure a modular
system if a portion of the wastewater that has passed through the peat filter
is recirculated back to the pump chamber.
3. An applicant may use a peat filter system
if:
a. The native soil is excessively
permeable,
b. There is little
native soil overlying fractured or excessively permeable rock,
c. A reduction in setback distances or
minimum vertical separation is desired, or
d. Cold weather inhibits performance of other
treatment or disposal technologies.
B. Performance. An applicant shall ensure
that a peat filter is designed so that it produces treated wastewater that
meets the following criteria:
1. TSS of 15
milligrams per liter, 30-day arithmetic mean;
2. BOD5 of 15
milligrams per liter, 30-day arithmetic mean;
3. Total nitrogen (as nitrogen) of 53
milligrams per liter, 5-month arithmetic mean; and
4. Total coliform level of 100,000
(Log10 5) colony forming units per 100 milliliters, 95th
percentile.
C. Notice of
Intent to Discharge. In addition to the Notice of Intent to Discharge
requirements specified in
R18-9-A301(B)
and R18-9-A309(B), an
applicant shall submit:
1. Specifications for
the peat media proposed for use in the peat filter or provided in the peat
module, including:
a. Porosity;
b. Degree of humification;
c. pH;
d. Particle size distribution;
e. Moisture content;
f. A statement of whether the peat is air
dried, and whether the peat is from sphagnum moss or bog cotton; and
g. A description of the degree of
decomposition;
2.
Specifications for installing the peat media; and
3. If a peat module is used:
a. The name and address of the
manufacturer,
b. The model number,
and
c. A copy of the manufacturer's
warranty.
D.
Design requirements.
1. If a pump tank is
used to dose the peat module or bed, an applicant shall:
a. Ensure that the pump tank is sized to
contain the dose volume and a reserve volume above the high water alarm that
will contain the volume of daily design flow; and
b. Use a control panel with a programmable
timer to dose at the applicable loading rate.
2. Peat module system. In addition to the
applicable requirements in
R18-9-A312, the applicant shall:
a. Size the gravel bed supporting the peat
filter modules to allow it to act as a disposal works and ensure that the bed
is level, long, and narrow, and installed on contour to optimize lateral
movement away from the disposal area;
b. For modules designed to allow wastewater
flow through the peat filter and base material into underlying native soil,
size the base on which the modules rest to accommodate the soil absorption rate
of the native soil;
c. Place fill
over the module so that it conforms to the manufacturer's specification. If the
fill is planted, the applicant shall use only grass or shallow rooted plants;
and
d. Ensure that the peat media
depth is at least 24 inches, the peat is installed with the top and bottom
surfaces level, and the maximum wastewater loading rate is 5.5 gallons per day
per square foot of inlet surface at the rated daily design flow, unless the
Department approves a different wastewater loading rate under
R18-9-A309(E).
3. Peat filter bed system. In addition to the
applicable requirements in
R18-9-A312, the applicant shall
ensure that:
a. The bed is filled with peat
derived from sphagnum moss and compacted according to the installation
specification;
b. The maximum
wastewater loading rate is 1 gallon per day per square foot of inlet surface at
the rated daily design flow;
c. At
least 24 inches of installed peat underlies the distribution piping and 10 to
14 inches of installed peat overlies the piping;
d. The cover material over the peat filter
bed is slightly mounded to promote runoff of rainfall. The applicant shall not
place additional fill over the peat; and
e. The peat is air dried, with a porosity
greater than 90 percent, and a particle size distribution of 92 to 100 percent
passing a No. 4 sieve and less than 8 percent passing a No. 30
sieve.
E.
Installation requirements. In addition to the applicable requirements in
R18-9-A313(A),
the applicant shall:
1. Peat module system.
a. Compact the bottom of all excavations for
the filter modules, pump, aerator, and other components to provide adequate
foundation, slope the bottom toward the discharge to minimize ponding, and
ensure that the bottom is flat, and free of debris, rocks, and sharp objects.
If the excavation is uneven or rocky, the applicant shall use a bed of sand or
pea gravel to create an even, smooth surface;
b. Place the peat filter modules on a level,
6-inch deep gravel bed;
c. Place
backfill around the modules and grade the backfill to divert surface water away
from the modules;
d. Not place
objects on or move objects over the system area that might damage the module
containers or restrict airflow to the modules;
e. Cover gaps between modules to prevent
damage to the system;
f. Fit each
system with at least one sampling port that allows collection of wastewater at
the exit from the final treatment module;
g. Provide the modules and other components
with anti-buoyancy devices to ensure stability in the event of flooding or high
water table conditions; and
h.
Provide a mechanism for draining the filter module inlet line;
or
2. Peat filter bed
system.
a. Scarify the bottom and sides of
the leaching bed excavation to remove any smeared surfaces, and:
i. Unless directed by an installation
specification consistent with this Chapter, place peat media in the excavation
in 6-inch lifts; and
ii. Compact
each lift before the next lift is added. The applicant shall take care to avoid
compaction of the underlying native soil;
b. Lay distribution pipe in trenches cut in
the compacted peat, and
i. Ensure that at
least 3 inches of aggregate underlie the pipe to reduce clogging of holes or
scouring of the peat surrounding the pipe, and
ii. Place peat on top of and around the sides
of the pipes.
F. Operation and maintenance requirements. In
addition to the applicable requirements in
R18-9-A313(B),
the permittee shall inspect the finished grade over the peat filter for proper
drainage, protection from damaging loads, and root invasion of the wastewater
distribution system and perform maintenance as needed.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.