Fla. Admin. Code Ann. R. 62-555.401 - General Permit for Construction of Lead or Copper Corrosion Control, or Iron or Manganese Sequestration, Treatment Facilities for Small or Medium Public Water Systems
(1) A general
permit is hereby granted to any small or medium system, as defined in Rule
62-550.200, F.A.C., for the
construction of lead or copper corrosion control treatment facilities, provided
that the facilities are designed in accordance with part III of this chapter
and provided that:
(a) Per subsections
62-4.530(1) and
62-555.520(2),
F.A.C., the system notifies the Department at least 30 days before beginning
construction using Form
62-555.900(18),
Notice of Intent to Use the General Permit for Construction of Lead or Copper
Corrosion Control, or Iron or Manganese Sequestration, Treatment Facilities for
Small or Medium PWSs, as incorporated into subsection
62-555.520(2),
F.A.C. The completed notice form shall be submitted to the appropriate
Department of Environmental Protection District Office or Approved County
Health Department and shall be accompanied by the permit processing fee
described in subsection
62-555.520(6),
and listed in paragraph
62-4.050(4)(p),
F.A.C.
(b) The selected lead or
copper corrosion control treatment is consistent with the guidance and
recommendations in the Lead and Copper Guidance Manual, Volume II:
Corrosion Control Treatment as adopted in Rule
62-555.335,
F.A.C.
(2) A general
permit is hereby granted to any small or medium system, as defined in Rule
62-550.200, F.A.C., for the
construction of iron or manganese sequestration treatment facilities, provided
that the facilities are designed in accordance with Part III of this chapter
and provided that, per subsections
62-4.530(1) and
62-555.520(2),
F.A.C., the system notifies the Department at least 30 days before beginning
construction using Form
62-555.900(18),
Notice of Intent to Use the General Permit for Construction of Lead or Copper
Corrosion Control, or Iron or Manganese Sequestration, Treatment Facilities for
Small or Medium PWSs, as incorporated into subsection
62-555.520(2),
F.A.C. The completed notice form shall be submitted to the appropriate
Department of Environmental Protection District Office or Approved County
Health Department and shall be accompanied by the permit processing fee
described in subsection
62-555.520(6),
and listed in paragraph
62-4.050(4)(p),
F.A.C.
(3) This general permit is
subject to the general conditions in Rule
62-4.540, F.A.C., and the
following specific conditions:
(a) If the
treatment facilities being constructed under this general permit were designed
under the responsible charge of a professional engineer, the permittee shall
retain a Florida-licensed professional engineer in accordance with subsection
62-555.530(3),
F.A.C., to take responsible charge of inspecting construction of the facilities
for the purpose of determining in general if the construction proceeds in
compliance with this general permit, including the approved preliminary design
report for the facilities.
(b) In
accordance with subsection
62-555.530(4),
F.A.C., the permittee shall have complete record drawings produced for the
treatment facilities being constructed under this general permit.
(c) To fulfill the requirements under
subsection 62-555.350(13),
F.A.C., the permittee shall provide an operation and maintenance manual for the
treatment facilities constructed under this general permit.
(d) Per Rule
62-555.345, F.A.C., the
permittee shall submit a certification of construction completion to the
Department and obtain approval, or clearance, from the Department before
placing any treatment facilities constructed under this general permit into
operation for any purpose other than disinfection, testing for leaks, or
testing equipment operation. This specific condition does not prohibit the
permittee from cutting into existing water mains and returning the water mains
to operation in accordance with subsection
62-555.340(5),
F.A.C., without the Department's approval.
Notes
Rulemaking Authority 403.814(1), 403.861(9) FS. Law Implemented 403.0877, 403.814(1), (4), 403.861(7), (10) FS.
New 12-10-96, Amended 8-28-03.