Or. Admin. Code § 340-216-0052 - Construction ACDP
(1) Purpose. A
Construction ACDP is a permit for approval of Type 3 construction or
modification changes as specified in OAR
340-210-0225 and
340-210-0240. The Construction
ACDP includes requirements for the construction or modification of stationary
sources or air pollution control devices and does not by itself provide
authorization to operate the new construction or modification. A new or
modified Standard ACDP or Oregon Title V Operating Permit is required before
operation of the new construction or modification. A Construction ACDP may be
used for the following situations:
(a) For
complex construction or modification projects that require an extended period
of time to construct, the Construction ACDP may provide construction approval
faster than issuance of a Standard ACDP or modified Standard ACDP because the
operating requirements would not need to be included in the permit.
(b) For Oregon Title V Operating Permit
sources, the Construction ACDP may include the requirements of OAR
340-218-0050 and follow the
external review procedures in OAR
340-218-0210 and
340-218-0230 so that the
requirements may later be incorporated into the Oregon Title V Operating Permit
by an administrative amendment. If the applicant elects to incorporate the
Construction ACDP by administrative amendment, all of the application
submittal, permit content, and permit issuance requirements of OAR 340 division
218 must be met for the Construction ACDP.
(2) Application requirements. Any person
requesting a Construction ACDP must:
(a)
Submit an application according to OAR
340-216-0040 and provide the
information specified in
340-216-0040(1)
as it relates to the proposed new construction or modification; and
(b) Provide a list of any applicable
requirements related to the new construction or modification.
(3) Fees. Applicants for a
Construction ACDP must pay the fees in OAR
340-216-8020.
(4) Permit content. A Construction ACDP must
include at least the following:
(a) A
requirement that construction must commence within 18 months after the permit
is issued if required by OAR
340-224-0030(4);
(b) A requirement to construct according to
approved plans;
(c) A requirement
to comply with all applicable requirements;
(d) Emission limits for affected stationary
sources;
(e) Performance standards
for affected stationary sources and air pollution control devices;
(f) Performance test requirements;
(g) Monitoring requirements, if specialized
equipment is required (e.g., continuous monitoring systems);
(h) Notification and reporting requirements
(construction status reports, startup dates, source test plans, CEMS
performance specification testing plans, etc.);
(i) General ACDP conditions for incorporating
generally applicable requirements;
(j) A requirement to modify the operating
permit before commencing operation of the new construction or
modification;
(k) A permit
expiration date of no more than 5 years; and
(l) Oregon Title V Permit requirements as
specified in OAR 340-218-0050, if the applicant
requests the external review procedures in
340-218-0210 and
340-218-0230.
(5) Permit issuance procedures:
(a) A Construction ACDP requires that DEQ
provide public notice according to OAR 340 division 209 as a Category III
permit action.
(b) For sources
subject to the Oregon Title V Operating Permit program, the applicant may ask
for the external review procedures in OAR
340-218-0210 and
340-218-0230 in addition to the
requirements of OAR 340 division 209 to allow the Construction ACDP to be
incorporated into the Oregon Title V Operating Permit at a later date by an
administrative amendment provided the requirements of subsection (1)(b) are
met.
(c) Issuance of a modified
Construction ACDP requires the following public notice, as applicable:
(A) Public notice as a Category I permit
action under OAR 340 division 209 for non-technical modifications and basic and
simple technical modifications; or
(B) Public notice as a Category II permit
action under OAR 340 division 209 for moderate and complex technical
modifications.
(6) Construction ACDPs may not be renewed.
[NOTE: This rule is included in the State of Oregon Clean Air Act Implementation Plan as adopted by the EQC under OAR 340-200-0040.]
[NOTE: All tables are found in OAR 340-216-8010, -8020, -8030.]
Notes
Tables referenced are available from the agency.
Statutory/Other Authority: ORS 468.020, 468.065, 468A.025, 468A.040, 468A.310 & 468A.315
Statutes/Other Implemented: ORS 468 & 468A