Or. Admin. Code § 350-082-0080 - Application for Review and Approval Required
(1)
The application form required for National Scenic Area review is available at
the Gorge Commission Office and on the Gorge Commission's website.
(2) All proposed developments and land uses
shall be reviewed according to the standards in effect on the date the
applicant submits a complete application for National Scenic Area
review.
(3) A complete application
is one that the Executive Director determines meets the requirements in this
land use ordinance for a complete application form, a complete site plan
showing the proposed site (site plans with alternative sites or building
envelopes are not sufficient), all applicable information specified in the
various sections of this land use ordinance, and other information that the
Executive Director requires to make findings based on substantial evidence in
the whole record and conclusions for compliance with the guidelines in this
land use ordinance.
(4) The
Executive Director will not accept an incomplete application for
review.
(5) Prior to accepting an
application or at any time during review of an application, the Executive
Director may require the applicant to amend an application or withdraw an
application and file a new application to resolve violations of applicable
National Scenic Area standards or a prior Executive Director decision at the
same time as the current application.
(6) The Executive Director shall accept and
review the application pursuant to the procedures and requirements in
350-082-0080 through
350-082-0170 for consistency
with the appropriate guidelines of this land use ordinance.
(7) The Executive Director may charge a fee
for review of applications. The Gorge Commission shall set the fee after a
public hearing.
(8) Applications
for National Scenic Area review of a proposed use or development shall provide
the following information.
(a) The applicant's
name, mailing address, telephone number, and email address;
(b) The name, mailing address, telephone
number, and email address of the landowner and all other persons or entities
that hold easements or other partial interests that give a right to use or
refuse use of land, as determined by the Executive Director;
(c) The county in which the proposed use or
development would be located;
(d)
The section, quarter section, township and range in which the proposed
development would be located;
(e)
The street address of the proposed use or development;
(f) The tax lot number(s) and size in acres
of the parcel(s) involved;
(g) A
description of the current land use for the parcel(s) involved and adjoining
lands;
(h) A written description of
the proposed use or development, including details on the height, exterior
color(s), and construction materials of the proposed structures;
(i) A list of Key Viewing Areas from which
the proposed use would be visible;
(j) A map of the project area. The map shall
be drawn to scale. The scale of the map shall be large enough to allow the
Executive Director to determine the location and extent of the proposed use or
development and evaluate its effects on scenic, cultural, natural, and
recreation resources. The map shall be prepared at a scale of one inch equals
200 feet (1:2,400), or a scale providing greater detail. If a parcel is very
large, the map does not need to show the entire parcel; rather, it can show
only those portions of the parcel affected by the proposed use. The map shall
include the following elements:
(A) North
arrow;
(B) Map scale;
(C) Boundaries, dimensions, and size of the
subject parcel;
(D) Significant
terrain features or landforms (e.g., cliffs, rock faces, slopes, stands of
trees);
(E) Groupings and species
of trees or other vegetation on the parcel;
(F) Location and species of vegetation that
would be removed or planted;
(G)
Bodies of water and watercourses, including intermittent and ephemeral
streams;
(H) Location and width of
existing and proposed roads, driveways, and trails;
(I) Location, dimensions, height, and size
(in square feet) of existing and proposed structures;
(J) Location of existing and proposed
services including wells or other water supplies, sewage disposal systems,
power and telephone poles and lines, and outdoor lighting; and
(K) Location and depth of all proposed
grading and ditching
(k)
Elevation drawings, which shall show the appearance of proposed structures and
shall include natural grade, finished grade, and the geometrical exterior of at
least the length and width of structures as seen from a horizontal view.
Elevation drawings shall be drawn to scale and include sizes and dimensions of
windows, doors, and covered openings;
(l) A list of names and addresses of the
adjacent property owners within a distance of the subject parcel as determined
in 350-082-0110 Table 1 - Notice
Requirements;
(m) Any additional
information that the applicant feels will assist in the evaluation of the
proposal, including but not limited to, maps, drawings, and development plans;
and
(n) The signature of the
applicant, and the signature or other statement of the landowner and other
persons or entities that hold easements or other partial interests that give a
right to use or refuse use of land, as determined by the Executive Director
indicating that they are aware of the application and that authorizes the
Executive Director or the Executive Director's designee reasonable access to
the site in order to evaluate the application and to conduct inspections during
construction of an approved development or land use, and a final inspection
when construction is completed.
(9) The Executive Director may require
additional information necessary to demonstrate compliance with this land use
ordinance, including but not limited to, a professional land survey and staking
of proposed structure and building locations that are close to a property or
buffer boundary, a professionally drawn site and landscaping plan, and copies
of or other proof of prior building permits and land use permits.
(10) The Executive Director shall provide
Firewise information to applicants with application forms and encourage and
assist applicants to incorporate Firewise standards in their proposals as
appropriate and as consistent with the resource protection provisions in the
Management Plan.
(11) Requirements
for applications for Emergency/Disaster Response Actions are contained in
350-082-0230.
(12) Completed application forms shall be
submitted directly to the Gorge Commission office.
Notes
Statutory/Other Authority: ORS 196.150, RCW 43.97.015, 16 USC § 544e(c) & 16 USC § 544f(l)
Statutes/Other Implemented: ORS 196.150, RCW 43.97.015, 16 USC § 544e(c) & 16 USC § 544f(l)
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.