Or. Admin. Code § 690-086-0170 - Municipal Water Supply Element of a Municipal WMCP
The water supply element of a Municipal WMCP shall include at least the following:
(1) A delineation
of the current and future service areas consistent with state land use law that
includes available data on population projections and anticipated development
consistent with relevant acknowledged comprehensive land use plans and urban
service agreements or other relevant growth projections;
(2) An estimated schedule that identifies
when the water supplier expects to fully exercise each of the water rights and
water use permits currently held by the supplier;
(3) Based on the information provided in
section (1) of this rule, an estimate of the water supplier's water demand
projections for 10 and 20 years, and at the option of the Municipal Water
Supplier, longer periods;
(4) A
comparison of the projected water needs and the sources of water currently
available to the Municipal Water Supplier and to any other suppliers to be
served considering the reliability of existing sources;
(5) If any expansion or initial diversion of
water allocated under existing permits is necessary to meet the needs shown in
section (3) of this rule, an analysis of alternative sources of water that
considers availability, reliability, feasibility and likely environmental
impacts. The analysis shall consider the extent to which the projected water
needs can be satisfied through:
(a)
Implementation of conservation measures identified under OAR
690-086-0150;
(b) Interconnection
with other municipal supply systems and cooperative regional water management;
and
(c) Any other conservation
measures that would provide water at a cost that is equal to or lower than the
cost of other identified sources.
(6) If any expansion or initial diversion of
water allocated under existing permits is necessary to meet the needs shown in
section (3) of this rule, a quantification of the maximum rate and monthly
volume of water to be diverted under each of the permits;
(7) For any expansion or initial diversion of
water under existing permits, a description of mitigation actions the water
supplier is taking to comply with legal requirements including but not limited
to the Endangered Species Act (ESA;
16
U.S.C. §
1531 et seq.), Clean Water Act
(CWA;
33 U.S.C. §
1251 et seq.), and Safe Drinking Water Act
(SDWA;
42
U.S.C. §
300f); and
(8) If acquisition of new water rights will
be necessary within the next 20 years to meet the needs estimated in section
(3) of this rule, an analysis of alternative sources of the additional water
that considers availability, reliability, feasibility and likely environmental
impacts and a schedule for development of the new sources of water. The
analysis shall consider the extent to which the need for new water rights can
be eliminated through:
(a) Implementation of
conservation measures identified under OAR 690-086-0150;
(b) Interconnection with other municipal
supply systems and cooperative regional water management; and
(c) Any other conservation measures that
would provide water at a cost that is equal to or lower than the cost of other
identified sources.
Notes
Statutory/Other Authority: ORS 536.027, 537.211 & 540.572
Statutes/Other Implemented: ORS 537.230, 537.630 & 539.010