Utah Admin. Code R309-210-7 - Asbestos Distribution System Monitoring
(1) The frequency of monitoring conducted to
determine compliance with the maximum contaminant level for asbestos specified
in
R309-200-5(1)
shall be conducted as follows:
(a) Each
community and non-transient non-community water system is required to monitor
for asbestos during the first three-year compliance period of each nine-year
compliance cycle beginning in the compliance period starting January 1,
1993.
(b) If the system believes it
is not vulnerable due to corrosion of asbestos-cement pipe, it may apply to the
Director for a waiver of the monitoring requirement in paragraph (a) of this
section. If the Director grants the waiver, the system is not required to
monitor for asbestos.
(c) The
Director may grant a waiver based on a consideration of the use of
asbestos-cement pipe for finished water distribution and the corrosive nature
of the water.
(d) A waiver remains
in effect until the completion of the three-year compliance period. Systems not
receiving a waiver must monitor in accordance with the provisions of paragraph
(a) of this section.
(2)
A system vulnerable to asbestos contamination due solely to corrosion of
asbestos-cement pipe shall take one sample at a tap served by asbestos-cement
pipe and under conditions where asbestos contamination is most likely to
occur.
(3) A system vulnerable to
asbestos contamination due both to its source water supply (as specified in
R309-205-5(2)) and corrosion of asbestos-cement pipe shall take one sample at a tap served
by asbestos-cement pipe and under conditions where asbestos contamination is
most likely to occur.
(4) A system
which exceeds the maximum contaminant levels as determined in
R309-205-5(1)(g)
shall monitor quarterly beginning in the next quarter after the violation
occurred.
(5). The Director may
decrease the quarterly monitoring requirement to the frequency specified in
paragraph (a) of this section provided the Director has determined that the
system is reliably and consistently below the maximum contaminant level. In no
case can the Director make this determination unless a groundwater system takes
a minimum of two quarterly samples and a surface (or combined surface/ground)
water system takes a minimum of four quarterly samples.
(6) If monitoring data collected after
January 1, 1990 are generally consistent with the requirements of R309-210-7,
then the Director may allow systems to use that data to satisfy the monitoring
requirement for the initial compliance period beginning January 1,
1993.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.