Utah Admin. Code R746-312-12 - Interconnection Monitoring
(1) Generating
facilities approved and interconnected to the public utility under the Level 1
and Level 2 interconnection review processes, and generating facilities with
nameplate capacities of 3 megawatts or less approved under the Level 3
interconnection review process, except as noted in Section
R746-312-12, are not required to
provide for remote monitoring of the electric output by the public
utilities.
(2) Generating
facilities approved under Level 3 Interconnection Applications with Electric
Nameplate Capacities greater than 5 MW or Level 3 Interconnection Applications
if the aggregated generation on the circuit, including the interconnection
customer's generating facility, would exceed 50% of the line section annual
peak load may be required to provide remote monitoring at the public utility's
discretion if the public utility has required this monitoring of its own
facilities.
(3) If a public utility
determines monitoring data provided by telemetry is necessary for safe,
reliable, and efficient operations of a proposed generating facility with an
electric nameplate capacity of greater than 3 megawatts to 5 megawatts, the
public utility may petition the commission on a case-by-case basis to impose
monitoring and telemetry requirements on the facility. The petition must be
accompanied by evidence supporting telemetry needs and requirements.
(4) For generating facilities required to
provide remote monitoring pursuant to Subsections
R746-312-12(2)
and R746-312-12(3),
the data acquisition and transmission to a point where it may be used by the
public utility's control system operations must meet the performance-based
standards as follows:
(a) Any data acquisition
and telemetry equipment required by this rule must be installed, operated, and
maintained at the interconnection customer's expense.
(b) Telemetry requirements:
(i) parties may mutually agree to waive or
change any of the telemetry requirements contained in Subsection
R746-312-12(4)(b).
(ii) the communication must take place via a
Private Network Link using a Frame Relay or Fractional T-1 line or other
suitable device. Dedicated Remote Terminal Units, from the generating facility
to the public utility's substation and energy management system are not
required.
(iii) a single
communication circuit from the generating facility to the public utility is
sufficient.
(iv) communications
protocol must be DNP 3.0 or other standard used by the public
utility.
(v) the generating
facility must be capable of sending telemetric monitoring data to the public
utility at a minimum rate of every two seconds, from the output of the
generating facility's telemetry equipment to the public utility's energy
management system.
(vi) the least
data points that a generator facility shall provide telemetric monitoring to
the public utility are:
(A) net real power
flowing out or into the generating facility, measured as analog;
(B) net reactive power flowing out or into
the generating facility, measured as analog;
(C) bus bar voltage at the point of common
coupling, measured as analog;
(D)
data processing gateway (DPG) heartbeat, used to certify the telemetric signal
quality; and
(E) on-line or
off-line status.
(vii) If
an interconnection customer operates the equipment associated with the high
voltage switchyard interconnecting the generating facility to the public
utility's distribution system, and shall provide monitoring and telemetry, the
interconnection customer must provide the following monitoring to the public
utility in addition to the provisions in Subsection
R746-312-12(4)(b)(vi):
(A) switchyard line and transformer MW and
MVAR values;
(B) switchyard bus
voltage; and
(C) switching devices
status.