Utah Admin. Code R746-312-13 - Interconnection Fees and Charges
(1) For
a Level 1 interconnection review:
(a) A public
utility whose rates are determined by the commission may not charge an
application, or other fee, to an applicant that requests Level 1
interconnection review. However, if an application for Level 1 interconnection
review is denied because it does not meet the requirements for Level 1
interconnection review, and the applicant resubmits the application under the
Level 2 or Level 3 review procedure, the public utility may impose a fee for
the resubmitted application, consistent with Section
R746-312-13.
(b) Any other public utility may determine
reasonable fees or charges for interconnection, however for those
interconnections that fall under Title 54, Chapter 15, Net Metering of
Electricity, the fees must be determined in accordance with Title 54, Chapter
15, Net Metering of Electricity.
(2) For a Level 2 interconnection review, a
public utility whose rates are determined by the commission may charge fees of
up to $50 plus $1 per kilowatt of the generating facility's capacity to cover
the costs of the interconnection request review, plus the reasonable cost of
any required minor modifications to the electric distribution system or
additional reviews. Costs for these minor modifications or additional review
will be based on the public utility's non-binding, good faith estimates and the
ultimate installed costs. Costs for engineering work done as part of any
additional review or studies may not exceed $100 per hour. A public utility may
adjust the $100 hourly rate once each year to account for inflation and
deflation.
(3) For a Level 3
interconnection review, a public utility whose rates are determined by the
commission may charge fees of up to $100 plus $2 per kilowatt of the generating
facility's capacity, as well as charges for time spent on any required impact
or facilities studies. Costs for engineering work done as part of a
feasibility, impact, or facilities study may not exceed $100 per hour. A public
utility may adjust the $100 hourly rate once each year to account for inflation
and deflation as measured by the 12 months unadjusted Consumer Price Index for
any items calculated for December of the previous year. If the public utility
must install facilities to accommodate the interconnection of the generating
facility, the cost of these facilities shall be the responsibility of the
applicant.