Utah Admin. Code R746-313-3 - Purpose, Scope, Applicability, and Exceptions
(1) This rule establishes requirements for
each electric company to monitor and report on electric service
reliability.
(2) Unless otherwise
approved, an electric company whose governing authority is the commission
shall:
(a) follow the provisions of IEEE 1366
in the collection and analysis of interruption data and in the calculation and
reporting of reliability indices as required by this rule. If there is a
conflict between any provision in IEEE 1366 and this rule, this rule governs;
and
(b) include both "distribution
system" interruptions and "interruptions caused by events outside of the
distribution system," as defined in IEEE 1366, in the electric company's
recordkeeping, calculations, reporting, and filing as required by Sections
R746-313-4 through
R746-313-8.
(3) Unless otherwise approved, an electric
company whose governing authority is not the commission shall:
(a) follow the provisions of either IEEE 1366
or the RUS Bulletin 1730A-119 in the collection and analysis of interruption
data and in the calculation and reporting of reliability indices as required by
this rule. If a conflict exists between any provision in IEEE 1366 or RUS
1730A-119 and this rule, this rule governs; and
(b) include both "distribution system"
interruptions and interruptions caused by events outside of the distribution
system in the electric company's recordkeeping, calculations, reporting, and
filing as required by the electric service reliability rules found at Sections
R746-313-4 through
R746-313-8.
(4) The commission may, upon written request
and for good cause shown, waive or change this rule in accordance with Section
R746-1-109, Deviation from
Rules.