An applicant shall be in compliance with the reporting requirements of R746-400 prior to submitting an application for a general rate case. If the applicant is not in compliance with that rule, the applicant shall first submit any missing reports prior to submitting an application for a general rate case. An applicant submitting a general rate case application shall provide the following information with the application:
A. General Information:
1. Most recent Division of Drinking Water
certification/report.
2.
Certificate of Public Convenience and Need Number granted by the Commission and
its date.
3. Date the utility
started operation.
4. The number of
connections approved and current area served, which may be shown by service
area map.
5. Ownership and
officers.
6. Associated companies
(if any).
7. A copy of its current
tariff.
B. Engineering
Information.
1. Source of water
supply
2. Information for all
Wells
3. Mains and meters
information
4. Reservoirs
information
5. Storage
capacity
6. Service deficiencies
and remedies
7. Service
quality
8. Additions or
improvements in the last five years
9. Any anticipated additions or
improvements
10. Efforts to
encourage conservation
C. Customer Connection Information
1. Each connection identified by unique lot
number or address
2. The date first
put into service
3. Whether metered
or unmetered.
4. Whether classified
as residential or commercial
5. The
water usage per month or billing cycle, showing minimum and overage gallons
used
6. The amount billed per month
or billing cycle
7. The anticipated
growth, showing minimum and overage gallons used
8. Water usage and billings projected for the
next three years
9. Information on
any secondary/irrigation water system (the same information as C. 1, 2, 5, 6, 7
and 8 above).
10. Identification
whether secondary water is distributed through the culinary system.
D. Accounting and Financial Data,
which shall include the prior two complete years and current up to the date of
general rate case application, unless otherwise specified:
1. Identification (contact information) for
any accountant used by the utility.
2. Copies of the General Ledger.
3. Copies of the Balance Sheet
4. Copies of the Income Statement
5. Pro Forma Income Statements, categorized
by the National Association of Regulatory Utility Commissions, NARUC, System of
Accounts, to include:
a. the prior two years
of revenues and expenses, and
b.
the projected revenues and expenses for the next three years, to include the
Company's anticipated growth rate and requested rate increase.
6. A copy of or the utility's
check register
7. Billing
documentation/reports, tied back to the tariff rates
8. Information on the utility plant,
including, but not limited to:
a. Acquisition
date,
b. Acquisition price or
cost,
c. Salvage value,
d. Expected useful life,
e. Annual depreciation amount per
asset,
f. Accumulated depreciation
per asset and reconciled to the total accumulated depreciation amount to the
most recent Annual Report. (If these amounts do not match the most recent
Annual Report provide detailed explanations for any needed
adjustments),
g. If an asset was
donated, the amount applied to Contribution in Aid of Construction per
asset,
h. If donated, the
accumulated amortization of the Contribution in Aid of Construction per asset
and reconciled to the total accumulated amortization amount to the most recent
Annual Report. (If these amounts do not match the most recent Annual Report
provide detailed explanations for any needed adjustments), and
i. Projected future asset purchases for the
next three years, providing the estimated acquisition date and price.
9. Copies of tax returns for the
prior two complete years,
10.
Information on all Notes Payable, Loans, and other Obligations, This will
include all outstanding and those retired within the past two years, including:
a. Interest rate,
b. Beginning date,
c. Date of last scheduled payment (the Loan
pay-off date), and
d. Amount of
payment
E.
Customer Notice Information
1. A copy of any
notice sent to customers notifying them that the utility is seeking a rate
increase.