1 Va. Admin. Code § 30-41-200 - Major changes in personnel or equipment or a change of laboratory location
A. Major
change in personnel.
1. The drinking water
laboratory shall notify DCLS of a major change in the laboratory's personnel in
writing within 30 calendar days of the change.
2. A "major change in personnel" is defined
as (i) the loss or replacement of the laboratory director or laboratory
supervisor or (ii) the loss of all the trained and experienced analysts who had
been available to analyze a particular contaminant for which certification has
been granted.
3. DCLS shall follow
the procedure in
1VAC30-41-220 to downgrade the
laboratory to provisionally certified status if the laboratory fails to notify
DCLS within 30 calendar days of a major change in personnel.
B. Change of laboratory location.
1. The laboratory shall notify DCLS of a
change in the laboratory's location in writing at least 30 calendar days prior
to the location change.
2. DCLS may
perform an onsite assessment of the new facility when a laboratory changes
location.
3. DCLS shall follow the
procedure in
1VAC30-41-220 to downgrade the
laboratory to provisionally certified status if the laboratory fails to notify
DCLS of a change in the laboratory's location at least 30 days prior to the
location change.
C.
Equipment.
1. A drinking water laboratory
shall notify DCLS in writing within 30 calendar days of a major change in
equipment.
2. A drinking water
laboratory shall provide the following information to DCLS about new equipment:
a. Make and model of the new
instrument.
b. Date of installation
and training.
c. Initial
demonstration of capability (IDC) and minimum detection limit (MDL).
d. Updated standard operating procedure
(SOP).
e. Methods and contaminants
for which the instrument will be used.
f. Successful proficiency testing analyzed on
the new instrument.
g. Date the
instrument was put into service analyzing compliance samples.
3. DCLS shall follow the procedure
in 1VAC30-41-220 to downgrade the
laboratory to provisionally certified status if the laboratory fails to notify
DCLS within 30 calendar days of any major change in equipment.
D. Laboratory action to address
major changes to personnel or equipment or a change of location.
1. When a major change to laboratory
personnel or equipment or a change of location occurs, the laboratory shall
establish a schedule to address the change and provide the schedule in writing
to DCLS. The laboratory shall submit the schedule to DCLS along with the
notification of the change.
2. If
DCLS determines that the laboratory can no longer produce valid data because of
the major change in personnel or equipment or the change of location, DCLS
shall follow the procedure in
1VAC30-41-240 to revoke
certification for the contaminants in question.
Notes
Statutory Authority: §§ 2.2-1102 and 2.2-1105 of the Code of Virginia; 42 USC § 300f et seq.
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.