Permits for Facilities

  1. § 445A.390 - Permit required; operation under existing permit
  2. § 445A.391 - Application for permit: Preliminary meeting with representative of Department
  3. § 445A.3915 - Application for permit: Submission of technical document for preapplication review by Department; fee
  4. § 445A.392 - Application for permit: Construction or modification of process component; abbreviated application
  5. § 445A.393 - Application for permit: Definition of site conditions, process materials, characteristics of waste and impacts
  6. § 445A.394 - Application for permit: Submission; contents
  7. § 445A.395 - Contents of application: Assessment of area of review
  8. § 445A.396 - Contents of application: Meteorological report; analysis of samples
  9. § 445A.397 - Contents of application: Engineering design report; specifications for fluid management system
  10. § 445A.398 - Contents of application: Proposed operating plans
  11. § 445A.399 - Preparation of plan for seasonal closure of process components
  12. § 445A.400 - Initial review of application and notification of applicant; failure to provide information; submission of incorrect information
  13. § 445A.401 - Action by Department upon application
  14. § 445A.402 - Notice of intent to issue permit or deny application
  15. § 445A.403 - Request for hearing on application; submission of comments on draft permit
  16. § 445A.404 - Scheduling of public hearing on application
  17. § 445A.405 - Notice of hearing: Publication; contents
  18. § 445A.406 - Submission of testimony at hearing
  19. § 445A.407 - Issuance of statement responding to comments on draft permit
  20. § 445A.408 - Action by Director of Department after period for public comment
  21. § 445A.409 - Issuance and maintenance of permit; maximum term and renewal of permit
  22. § 445A.410 - [Repealed]
  23. § 445A.411 - Pilot facility or testing facility: Conditions for issuance of permit (Repealed)
  24. § 445A.412 - Pilot facility or testing facility: Contents of application for permit (Repealed)
  25. § 445A.413 - Pilot facility or testing facility: Construction of application indicating need to conduct testing beyond 2 years (Repealed)
  26. § 445A.414 - Permit for facility using physical separation methods
  27. § 445A.415 - Granting of permit which allows lower level of engineered containment than required by minimum design criteria
  28. § 445A.4155 - Conditions pursuant to which modification to design of facility with existing permit does not require new public notice; extension of term of existing permit disallowed
  29. § 445A.416 - Minor modification of existing permit; modification of operating plans
  30. § 445A.417 - Major modification of existing permit
  31. § 445A.418 - Fee for modification of permit
  32. § 445A.419 - Transfer of permit to new owner or operator
  33. § 445A.420 - Renewal of permit; operation of facility pending issuance of new permit