Wis. Admin. Code Department of Natural Resources NR 419.045 - Industrial wastewater operations
(1) APPLICABILITY
AND EXEMPTIONS.
(a)
Applicability. This section applies to any facility that
generates process wastewater and that meets all of the following criteria:
1. Is located in Milwaukee, Waukesha,
Washington, Ozaukee, Racine, Kenosha, or Sheboygan county.
2. Has combined total maximum theoretical
emissions of VOC equal to or greater than 100 tons per calendar year from all
of the following:
a. Industrial wastewater
sources (waste management units).
b. Any emissions unit that is not subject to
an emission limitation under ch. NR 420; s.
NR 421.03, 421.04, and 421.07; s.
NR 422.05 to 422.08, 422.09, 422.10 to 422.125, 422.13, 422.131, 422.14, 422.141, 422.143, 422.144, and 422.15 to 422.16; and s.
NR 423.03, 423.037, and 423.05, except if the emissions unit
is regulated under 40 CFR part 60, subpart BBB, III, NNN, or RRR, or 40 CFR
part 63, subpart T.
3.
Has any of the following operations:
a. As
described by the 4-digit industry codes 2821, 2823, 2824, 2865, or 2869 listed
in the Standard Industrial Classification (SIC) Manual, 1987, incorporated by
reference in s.
NR 484.05(1), for the organic chemicals,
plastics, and synthetic fibers manufacturing industries.
b. As described by the 4-digit industry codes
2833, 2834, or 2836 listed in the SIC Manual, 1987, for the pharmaceuticals
manufacturing industry.
c.
Pesticide manufacturing.
d.
Hazardous waste treatment, storage, or disposal.
(b)
Exemptions.
1. Wet weather retention basins are exempt
from this section.
2. Any facility
with an annual affected VOC loading in wastewater, as determined in accordance
with sub. (8) (e), less than or equal to 10 mega grams (11.03 tons) is exempt
from the control requirements of sub. (2).
3. If compliance with the control
requirements of sub. (2) would create a safety hazard in a waste management
unit, the owner or operator may request the department exempt the waste
management unit from the control requirements of sub. (2). The department, with
written concurrence from EPA, may approve the request if it is justified by the
likelihood and magnitude of the potential injury and if the department
determines that reducing or eliminating the hazard is technologically or
economically unreasonable.
(2) EMISSION CONTROL REQUIREMENTS. Except as
provided in sub. (3), the owner or operator of a facility subject to this
section shall comply with the control requirements of this subsection for any
waste management unit that receives, manages, or treats an affected VOC
wastewater stream or affected residual. The control requirements apply from the
point where an affected VOC wastewater stream exits a process unit to the point
the affected VOC wastewater stream, including any affected residual, is either
returned to a process unit or treated in accordance with par. (f).
(a)
Drains. For each
individual drain system that receives or manages an affected VOC wastewater
stream or an affected residual, the owner or operator shall either comply with
subd. 1. or with subds. 2. to 6.
1. Operate
and maintain a cover on each opening in the individual drain system, and if the
cover is vented, route the vapors to a process or through a closed vent system
to a control device and meet all of the following requirements:
a. Maintain the cover and all openings in a
closed position at all times that an affected VOC wastewater stream or an
affected residual is in the drain system except when it is necessary to use the
opening for sampling or removal, or for equipment inspection, maintenance, or
repair.
b. Design and operate the
control device to reduce the affected VOC vented to the device by at least 90%
by weight.
c. Design and operate
the individual drain system to segregate the vapors within the system from
other drain systems and the atmosphere.
2. Equip each drain with a water seal or a
tightly fitting cap or plug.
3. If
a water seal is used on a drain receiving an affected VOC wastewater stream or
an affected residual, extend the pipe discharging the wastewater below the
liquid surface in the water seal of the receiving drain, or install a flexible
shield, or other enclosure which restricts wind motion across the open area
between the pipe and the drain, that encloses the space between the pipe
discharging the wastewater to the drain receiving the wastewater. A water seal
which is used on a hub receiving a wastewater stream that is not an affected
VOC wastewater stream or an affected residual for the purpose of eliminating
cross ventilation to drains carrying an affected VOC wastewater stream or an
affected residual is not required to have an extended subsurface discharging
pipe or a flexible shield.
4. Equip
each junction box with a tightly fitting solid cover that has no visible gaps,
cracks, or holes and which is kept in place at all times except during
inspection and maintenance.
5. If
the junction box is vented, vent the box to a process or through a closed vent
system to a control device that is designed and operated to reduce the VOC
vented to it by at least 90% by weight, except that if the junction box is
filled and emptied by gravity flow or is operated with no more than slight
fluctuations in the liquid level, the owner or operator may vent the junction
box to the atmosphere provided both of the following conditions are met:
a. The junction box has a vent pipe of at
least 90 centimeters in length and no greater than 10.2 centimeters in nominal
inside diameter.
b. Water seals are
installed and maintained at all wastewater entrances to, or exits from, the
junction box restricting ventilation in the individual drain system and between
components in the individual drain system.
6. Ensure that each sewer line is not open to
the atmosphere by covering or enclosing the line so that no visible gaps or
cracks in joints, seals, or other emission interfaces are visible.
(b)
Surface
impoundments. For each surface impoundment that receives, manages, or
treats an affected VOC wastewater stream or an affected residual, the owner or
operator shall comply with either subd. 1. or 2.
1. Equip the surface impoundment with a cover
and a closed vent system which routes the VOC vapors vented from the surface
impoundment to a control device and meet all of the following requirements:
a. Maintain each opening in a closed position
whenever an affected VOC wastewater stream or an affected residual is in the
surface impoundment except when it is necessary to use the opening for
sampling, removal, or for equipment inspection, maintenance, or
repair.
b. Use the cover whenever
an affected VOC wastewater stream or an affected residual is in the surface
impoundment except during removal of treatment residuals in accordance with
40 CFR
268.4 or closure of the surface impoundment
in accordance with
40 CFR
264.228.
c. Design and operate the control device to
reduce the affected VOC vented to it by at least 90% by weight.
2. Equip the surface impoundment
with a floating flexible membrane cover and meet all of the following
requirements:
a. Design the flexible membrane
cover to float on the liquid surface during normal operations, and to form a
continuous barrier over the entire surface area of the liquid.
b. Fabricate the flexible membrane cover from
a synthetic membrane material that is either a high density polyethylene with a
thickness no less than 2.5 millimeters (100 mils) or a material, or a composite
of different materials, determined to have both organic permeability properties
that are equivalent to those of the high density polyethylene material, and
chemical and physical properties that maintain the material integrity for the
intended service life of the material.
c. Install the flexible membrane cover so
that there are no visible cracks, holes, gaps, or other open spaces between
cover section seams or between the interface of the cover edge and its
foundation mountings.
d. Equip each
opening in the flexible membrane cover with a closure device that is designed
to operate so that when the closure device is secured in the closed position
there are no visible cracks, holes, gaps, or other open spaces in the closure
device or between the perimeter of the cover opening and the closure device.
Notwithstanding the requirements of this subd. 2. d., the flexible membrane
cover may be equipped with one or more emergency cover drains for removal of
stormwater. Each emergency cover drain shall be equipped with a slotted
membrane fabric cover that covers at least 90% of the area of the opening or a
flexible fabric sleeve seal.
e.
Whenever an affected VOC wastewater stream or an affected residual is in the
surface impoundment, the flexible membrane cover shall float on the liquid and
each closure device shall be secured in the closed position. Closure devices
may be opened or the flexible membrane cover may be removed to provide access
to the surface impoundment for performing routine inspection, maintenance, or
other activities needed for normal operations or to remove accumulated sludge
or other residues from the bottom of the surface impoundment.
(c)
Oil-water
separator. For each oil-water separator that receives, manages, or
treats an affected VOC wastewater stream or an affected residual, the owner or
operator shall comply with either subd. 1. or 2.:
1. Equip the oil-water separator with a fixed
roof and a closed vent system that route the vapors vented from the oil-water
separator to a control device and meet all of the following requirements:
a. Maintain each opening in the fixed roof in
a closed, sealed position at all times that the oil-water separator contains an
affected VOC wastewater stream or an affected residual, except when it is
necessary to use the opening for sampling or removal, or for equipment
inspection, maintenance, or repair.
b. Design and operate the control device to
reduce the VOC vented to it by at least 90% by weight.
2. Equip the oil-water separator with a
floating roof that meets all of the following requirements:
a. Except as provided in this subd. 2. a.,
the floating roof shall have a closure device between the floating roof and the
wall of the oil-water separator. For portions of the oil-water separator where
it is infeasible to construct and operate a floating roof, such as over the
weir mechanism, the owner or operator shall operate and maintain a fixed roof,
closed vent system, and control device that meet the requirements specified in
subd. 1.
b. The closure device
shall consist of a primary seal and a secondary seal. The primary seal shall be
a liquid-mounted seal or a mechanical shoe seal. The secondary seal shall be
above the floating roof and cover the annular space between the floating roof
and the wall of the separator.
c.
The floating roof shall be floating on the liquid at all times and may not be
resting on the roof supports, except during abnormal conditions such as low
flow rate.
d. Each opening in the
floating roof shall be equipped with a cover, seal or lid fitted with a gasket,
which shall be maintained in the closed position at all times, except during
inspection and maintenance. Notwithstanding the requirements of this subd. 2.
d., the floating roof may be equipped with one or more emergency cover drains
for removal of stormwater. Each emergency cover drain shall be equipped with a
slotted membrane fabric cover that covers at least 90% of the area of the
opening or a flexible fabric sleeve seal.
(d)
Portable containers. For
each portable container that receives, manages, or treats an affected VOC
wastewater stream or an affected residual, the owner or operator shall operate
and maintain a cover on the portable container according to all of the
following requirements:
1. Maintain the cover
in place and maintain all openings in a closed position at all times that an
affected VOC wastewater stream or an affected residual is in the portable
container, except when it is necessary to use the opening for filling, removal,
inspection, sampling, or pressure relief events related to safety
considerations to prevent physical damage or permanent deformation of the
portable container or cover.
2. For
portable containers with a capacity greater than or equal to 110 gallons, use a
submerged fill pipe when a container is being filled by pumping with an
affected VOC wastewater stream or an affected residual. The submerged fill pipe
outlet shall extend to no more than six inches or within two fill pipe
diameters of the bottom of the container while the container is being
filled.
3. During treatment of an
affected VOC wastewater stream or an affected residual, including aeration,
thermal or other treatment, in a portable container, whenever it is necessary
for the container to be open, place the container within an enclosure with a
closed-vent system that routes the VOC vapors vented from the container to a
control device. The control device shall be designed and operated to reduce the
VOC vented to it by at least 90% by weight.
(e)
Wastewater tanks. For
each wastewater tank that receives, manages, or treats an affected VOC
wastewater stream or an affected residual, the owner or operator shall operate
and maintain a fixed roof for the wastewater tank. However, if the wastewater
tank is used for either heating wastewater or for treating by means of an
exothermic reaction, or the contents of the tank is sparged, or the wastewater
tank has a capacity equal to or greater than 40,000 gallons and the maximum
vapor pressure of the stored material is equal to or greater than 1.5 pounds
per square inch absolute, the owner or operator shall operate and maintain one
of the emission control techniques described in subd. 1., 2., or 3.
1. A fixed roof and a closed-vent system that
route the VOC vapors vented from the wastewater tank to a control device that
complies with both of the following requirements:
a. Each opening in the fixed roof shall be
maintained in a closed position at all times that the wastewater tank contains
an affected VOC wastewater stream or an affected residual, except when it is
necessary to use the opening for wastewater sampling, removal, or for equipment
inspection, maintenance, or repair.
b. The control device shall be designed and
operated to reduce the VOC vented to it by at least 90% by weight.
2. A fixed roof and an internal
floating roof that meet all of the following requirements:
a. The internal floating roof shall be
floating on the liquid surface at all times, except when the floating roof must
be supported by the leg supports during initial fill, after the tank has been
completely emptied and degassed, and when the tank is completely emptied before
being subsequently refilled.
b.
When the floating roof is resting on the leg supports, the process of filling,
emptying, or refilling shall be continuous and shall be accomplished as soon as
practical.
c. The internal floating
roof shall be equipped with a closure device between the wall of the tank and
the roof edge. The closure device shall consist of a liquid-mounted seal, or a
metallic shoe seal, or two seals mounted one above the other so that each forms
a continuous closure that completely covers the space between the wall of the
storage vessel and the edge of the internal floating roof. The lower seal may
be vapor-mounted, but both must be continuous seals.
d. Automatic bleeder vents are to be closed
at all times when the roof is floating, except when the roof is being floated
off of, or is being landed on, the roof leg supports.
e. Each opening in a noncontact internal
floating roof, except for automatic bleeder vents (vacuum breaker vents) and
rim space vents, is to provide a projection below the liquid surface.
f. Each opening in the internal floating
roof, except for leg sleeves, automatic bleeder vents, rim space vents, column
wells, ladder wells, sample wells, and stub drains, shall be equipped with a
cover or lid. The cover or lid shall be equipped with a gasket.
g. Each penetration of the internal floating
roof for the purposes of sampling shall be a sample well. Each sample well
shall have a slit fabric cover that covers at least 90% of the
opening.
h. Each automatic bleeder
vent shall be fitted with a gasket.
i. Each rim space vent shall be fitted with a
gasket.
j. Each penetration of the
internal floating roof that allows for passage of a ladder shall have a sliding
cover fitted with a gasket.
k. Each
penetration of the internal floating roof that allows for passage of a column
supporting the fixed roof shall have a flexible fabric sleeve seal or a sliding
cover fitted with a gasket.
L.
Each cover or lid on any opening in the internal floating roof shall be closed
so that there are no visible gaps, except when the cover or lid must be open
for access. Covers on each access hatch and each gauge float well shall be
bolted or fastened to be air-tight when they are closed. Rim space vents are to
be set to open only when the internal floating roof is not floating or when the
pressure beneath the rim seal exceeds the manufacturer's recommended
setting.
3. An external
floating roof that meets all of the following requirements:
a. Each external floating roof shall be
equipped with a closure device between the wall of the storage vessel and the
roof edge. The closure device shall consist of two seals, one above the other.
The lower seal (primary seal) shall be either a metallic shoe seal or a
liquid-mounted seal. The upper seal (secondary seal) shall be a rim-mounted or
shoe-mounted seal.
b. Except during
inspections, both the primary seal and the secondary seal shall completely
cover the annular space between the external floating roof and the wall of the
storage vessel in a continuous fashion.
c. Except for automatic bleeder vents (vacuum
breaker vents) and rim space vents, each opening in the noncontact external
floating roof shall provide a projection below the liquid surface.
d. Except for automatic bleeder vents, rim
space vents, roof drains, and leg sleeves, each opening in the roof shall be
equipped with a cover, seal, or lid fitted with a gasket. The cover, seal, or
lid shall be maintained in a closed position so there are no visible gaps at
all times, except when the cover or lid must be open for access. Covers on each
access hatch and each gauge float well shall be bolted or fastened to be
air-tight when they are closed.
e.
Automatic bleeder vents shall be closed at all times when the roof is floating,
except when the roof is being floated off of, or is being landed on, the roof
leg supports.
f. Rim space vents
shall be set to open only when the roof is being floated off of the roof leg
supports or when the pressure beneath the rim seal exceeds the manufacturer's
recommended setting.
g. Automatic
bleeder vents and rim space vents shall be fitted with a gasket.
h. Each roof drain that empties into the
stored liquid shall be provided with a slotted membrane fabric cover that
covers at least 90% of the area of the opening.
i. Each unslotted guide pole well shall have
a sliding cover fitted with a gasket or a flexible fabric sleeve
seal.
j. Each unslotted guide pole
shall have a cap fitted with a gasket on the end of the pole, which is closed
at all times except when gauging the liquid level or taking liquid
samples.
k. Each slotted guide pole
well shall have a sliding cover fitted with a gasket or a flexible fabric
sleeve seal.
L. Each slotted guide
pole shall have a float fitted with a gasket or other device that closes off
the liquid surface from the atmosphere.
m. Each gauge hatch or sample well shall have
a cover fitted with a gasket which is closed at all times except when the hatch
or well must be open for access.
n.
The external floating roof shall be floating on the liquid surface at all times
except when the floating roof must be supported by the leg supports during any
period of an initial fill, after the tank has been completely emptied and
degassed, or when the tank is completely emptied before being subsequently
refilled.
o. When the floating roof
is resting on the leg supports, the process of filling, emptying, or refilling
shall be continuous and shall be accomplished as soon as practical.
(f)
Treatment
processes. For each treatment process managing an affected VOC
wastewater stream or an affected residual, the owner or operator shall comply
with the requirements as specified in this paragraph. Once an affected VOC
wastewater stream or an affected residual has been treated in accordance with
the requirements of this paragraph, the affected VOC wastewater stream or the
affected residual is no longer subject to the requirements of this subsection.
1. Each component of the treatment process
shall meet the applicable requirements of pars. (a) to (e).
2. Gases vented from a treatment process
shall be routed by means of a closed vent system to a control device which is
designed and operated to reduce the VOC vented to it by at least 90% by weight.
Vents from anaerobic biological treatment processes may be routed through
hard-piping to a fuel gas system.
3. For each of the affected VOC wastewater
streams that are treated in a nonbiological treatment process, or a combination
of nonbiological treatment processes, the owner or operator shall, by removal
or destruction, reduce the mass flow rate of affected VOC by 90% or more while
reducing the affected VOC concentration to less than 1,000 parts per million by
weight. Dilution may not be used to achieve compliance with this subdivision.
This requirement does not apply to affected wastewater or affected residuals
that comply with the requirements for Resource Conservation and Recovery Act
(RCRA) (42 USC
6921 to
6939 e)
treatment options specified in subd. 6.
4. The owner or operator using a closed
biological treatment process for at least one affected VOC wastewater stream
shall reduce the mass flow rate for all affected VOC from all wastewater
streams entering the biological treatment process by at least 90%.
5. The owner or operator shall operate and
maintain a steam stripper that meets all of the following requirements:
a. Minimum active column height of five
meters.
b. Countercurrent flow
configuration with a minimum of ten actual trays.
c. Minimum steam flow rate of 0.04 kilograms
of steam per liter of wastewater feed within the column.
d. Minimum wastewater feed temperature to the
steam stripper of 95°C, or minimum column operating temperature of
95°C.
e. Maximum liquid loading
of 67,100 liters per hour per square meter.
f. Operate at nominal atmospheric
pressure.
6. The owner
or operator may elect to treat the affected VOC wastewater stream or affected
residual in a unit identified in, and complying with any of the following RCRA
treatment options:
a. The affected VOC
wastewater stream or affected residual is discharged to a hazardous waste
incinerator for which the owner or operator has been issued a final permit
under 40 CFR part 270 and complies with the requirements of 40 CFR part 264, subpart O, or has certified compliance with the interim status requirements of
40 CFR part 265, subpart O.
b. The
affected VOC wastewater stream or affected residual is discharged to a process
heater or boiler burning hazardous waste for which the owner or operator has
either been issued a final permit under 40 CFR part 270 and complies with the
requirements of 40 CFR part 266, subpart H, or has certified compliance with
the interim status requirements of 40 CFR part 266, subpart H.
c. The affected VOC wastewater stream or
affected residual is discharged to an underground injection well for which the
owner or operator has been issued a final permit under 40 CFR part 270 or 40
CFR part 144 and complies with the requirements of 40 CFR part 122 . The owner
or operator shall comply with all applicable requirements of this subsection
prior to the point where the wastewater enters the underground portion of the
injection well.
7. For
each affected residual, the owner or operator shall control for air emissions
by complying with pars. (a) to (e) and one of the following requirements:
a. Recycle the affected residual to a
production process on-site or transfer the affected residual off-site for the
purpose of recycling. Once an affected residual is returned to a production
process, the affected residual is no longer subject to this
subsection.
b. Return the affected
residual to the treatment process.
c. Treat the affected residual to destroy the
total combined mass flow rate of affected VOC by 99% or more in a nonbiological
treatment process.
d. Comply with
the requirements for treatment options specified in subd. 6.
(3)
ALTERNATIVE METHODS OF CONTROL. The following alternate methods of
demonstrating and documenting continuous compliance with the applicable control
requirements or exemption criteria in this section may be utilized if approved
by the department with written concurrence from EPA:
(a) As an alternative to the control
requirements of sub. (2), the owner or operator of waste management units may
elect to ensure that the overall control of VOC emissions at the facility from
wastewater from affected industrial categories is at least 90% less than the
2011 calendar year baseline emissions for VOC emissions to the ambient air from
process wastewater, provided that adequate documentation is submitted to the
department which supports the accuracy of the calendar year baseline emissions
and the following requirements are met:
1.
The owner or operator of a waste management unit shall submit a control plan to
the department which demonstrates that the overall control of VOC emissions at
the facility from wastewater from affected industrial categories will be at
least 90% less than the calendar year baseline emissions. Any control plan
submitted shall be approved by the department in writing before the owner or
operator may use the control option available under this paragraph for
compliance. At a minimum, the control plan shall include the applicable
emissions units' identification; the facility identification number; the
calendar year baseline emission rates of VOC from wastewater from affected
industrial categories consistent with the calendar year baseline emissions; a
plot plan showing the location, the emissions units' identification, and
facility identification number associated with a waste management unit; the VOC
emission rates for each emissions unit for the preceding calendar year; and an
explanation of the recordkeeping procedure and calculations which will be used
to demonstrate compliance. The VOC emission rates shall be calculated in a
manner consistent with the calendar year baseline emissions.
2. The owner or operator shall submit an
annual report no later than March 31 of each calendar year to the department
which demonstrates that the overall control of VOC emissions from wastewater
from affected industrial categories during the preceding calendar year is at
least 90% less than the baseline emissions. At a minimum, the report shall
include the facility identification number; the emissions units'
identification; the throughput of wastewater from affected industrial
categories; a plot plan showing the location; the emissions units'
identification; and the facility identification number associated with waste
management units; and the VOC emission rates for the preceding calendar year.
The emission rates for the preceding calendar year shall be calculated in a
manner consistent with the calendar year baseline emissions.
3. All control plans and reports shall
include documentation that the overall reduction of VOC emissions from
wastewater from affected industrial categories continues to be at least 90%
less than the calendar year baseline emissions. The emission rates shall be
calculated in a manner consistent with the calendar year baseline
emissions.
(b) The owner
or operator of an affected industrial category which is subject to and complies
with the provisions of 40 CFR part 63, subpart G, subpart JJJ, or subpart FFFF,
or any other emission standard promulgated under 40 CFR part 63 that references
the wastewater control requirements set forth in 40 CFR part 63, subpart G,
shall be deemed to be in compliance with this section, provided that all of the
following are met:
1. The term "affected VOC"
is substituted each place that 40 CFR part 63, subpart G, subpart JJJ, and
subpart FFFF, and any other 40 CFR part 63 emission standard references the
term "organic hazardous air pollutant" or "organic HAP".
2. For affected VOC not specifically listed
in table 9 of 40 CFR part 63, subpart G, the corresponding fraction removed
value shall be based on one of the following:
a. The procedures in 40 CFR part 60, appendix
J as proposed on December 9, 1998 in the Federal Register.
b. An assigned value of 0.99.
c. Use of WATER9, Versio n 2.0, a wastewater
treatment model, incorporated by reference in s.
NR 484.06(4)
(f).
3. Before implementing the option available
under this paragraph, the owner or operator provides written notice of the
intent to utilize this option to the department.
(4) INSPECTION AND MONITORING. The
owner or operator of a waste management unit that is subject to requirements
under sub. (2) or (3) shall comply with the following inspection and monitoring
requirements, except that an owner and operator subject to and in compliance
with a subpart in 40 CFR part 63 as provided in sub. (3) (b), may comply with
the inspection, monitoring, and record keeping requirements of that subpart
instead of the requirements of this subsection.
(a) All seals, covers, closed vent systems,
and other equipment used to comply with sub. (2) or (3) shall be visually
inspected for leaks and improper conditions semiannually and upon repair as
specified in this paragraph. If any seal, cover, closed vent system, or other
equipment is found to have a leak or be in improper condition, the equipment
shall be repaired as soon as possible, but no later than 15 calendar days after
detection, unless the repair or correction is technically infeasible without
requiring a process unit shutdown, in which case the repair or correction shall
be made during the next process unit shutdown.
1. For a wastewater tank equipped with a
fixed roof and vapor control system, visually inspect the fixed roof, openings,
and the closed vent system for leaks, except for a cover and closed vent system
maintained under negative pressure, and take corrective action.
2. For a wastewater tank equipped with an
internal or external floating roof, visually inspect for and correct the
following improper conditions:
a. An access
door or other opening is left open when not in use.
b. The floating roof is not resting on either
the surface of the liquid or on the leg supports.
c. There is stored liquid on the floating
roof.
d. A rim seal is detached
from the floating roof.
e. There
are holes, tears, cracks, or gaps in the rim seal or seal fabric of the
floating roof.
f. There are visible
gaps between the seal of an internal floating roof and the wall of the
wastewater tank.
g. Where a
metallic shoe seal is used on an external floating roof, one end of the
metallic shoe does not extend into the stored liquid or one end of the metallic
shoe does not extend a minimum vertical distance of 61 centimeters above the
surface of the stored liquid.
h. A
gasket, joint, lid, cover, or door has a crack or gap, or is broken.
3. For a surface impoundment,
visually inspect the cover and all openings for leaks, except for a cover and
closed vent system maintained under negative pressure, and take corrective
action.
4. For a surface
impoundment, visually inspect for and correct the following improper
conditions:
a. An access hatch or other
opening is left open when not in use.
b. A joint, lid, cover, or door has a crack
or gap, or is broken.
5.
For a portable container, visually inspect the cover and all openings for leaks
and take corrective action.
6. For
a portable container that is located within an enclosure that is vented by
means of a closed vent system to a control device, visually inspect the
enclosure and closed vent system for leaks, except for an enclosure and closed
vent system maintained under negative pressure, and take corrective
action.
7. For a portable
container, visually inspect for and correct the following improper conditions:
a. An access hatch or other opening is left
open when not in use.
b. A cover or
door has a gap or crack, or is broken.
8. For an individual drain system, visually
inspect for and correct the following improper conditions:
a. A joint, lid, cover, or door has a gap,
crack, or hole or is broken.
b. An
access hatch or other opening is left open when not in use for sampling or
removal, or for equipment inspection, maintenance, or repair.
c. Sufficient water is not present to
properly maintain integrity of water seals.
d. Drains using tightly-fitted caps or plugs
have caps and plugs that are not in place or not properly installed.
e. Junction boxes do not have covers in place
or covers have visible gaps, cracks, or holes.
f. Unburied portion of sewer lines have
cracks or gaps.
9. For a
junction box vented to a process or through a closed vent system to a control
device, visually inspect for and correct leaks in the closed vent
system.
10. For oil-water
separators, visually inspect fixed roof and all openings for leaks and take
corrective action.
11. For
oil-water separators, visually inspect for and correct the following improper
conditions:
a. An access door of other
opening is left open when not in use, or not equipping the door or opening with
a gasket.
b. The floating roof is
not resting on either the surface of the liquid or on the leg
supports.
c. There is stored liquid
on the floating roof.
d. A rim seal
is detached from the floating roof.
e. There are holes, tears, or other open
spaces in the rim seal or seal fabric of the floating roof.
f. A gasket, joint, lid, cover, or door has a
gap or crack, or is broken.
(b) For a wastewater tank or oil-water
separator equipped with an external floating roof having primary and secondary
seals used to comply with sub. (2) or (3), the secondary seal shall be
inspected for seal gaps and repaired as follows:
1. The secondary seal shall be measured for
seal gaps annually and after repair as follows:
a. The width of any seal gap is the distance
between the seal and the tank wall and shall be determined by using probes of
various widths to accurately measure the actual distance from the seal to the
tank wall.
b. The area of any seal
gap shall be determined by multiplying the width of the seal gap, as determined
in subd. 1. a., by the circumferential length of the gap.
c. The total seal gap area is the accumulated
area of all gaps which are greater than 0.125 inch in width.
2. The accumulated area of gaps
that exceed 0.125 inch in width between the secondary seal and tank wall may
not exceed 1.0 square inch per foot (21 square centimeters per meter) of tank
diameter.
3. If the seal gap
requirement of subd. 2. is not being met, the secondary seal shall be repaired
or replaced within 45 days after detection of the improper seal gap unless the
repair or correction is technically infeasible without requiring a process unit
shutdown, in which case the repair or correction shall be made at the next
process unit shutdown.
(c) The following records shall be maintained
on leaks, improper conditions, and improper seal gaps:
1. The date on which a leak, improper
condition, or improper seal gap is discovered.
2. The date on which a first attempt at
repair was made to correct the leak or improper condition.
3. The date on which a leak, improper
condition, or improper seal gap is repaired.
(d)
1.
Monitors shall be installed and maintained to measure operational parameters of
any emission control device or other device installed to comply with sub. (2)
or (3). Monitoring parameters shall be sufficient to demonstrate proper
functioning of the devices to design specifications. Except as provided in
subd. 2., the following monitoring and data recording shall be performed as
applicable:
a. For an enclosed non-catalytic
combustion device, continuously monitor and record the temperature of the gas
stream either in the combustion chamber or immediately downstream before any
substantial heat exchange.
b. For a
catalytic incinerator, continuously monitor and record the temperature of the
gas stream immediately before and after the catalyst bed.
c. For a condenser, continuously monitor and
record the temperature of the gas stream at the condenser exit.
d. For a carbon adsorber, continuously
monitor and record the VOC concentration of exhaust gas stream to determine if
breakthrough has occurred. If the carbon adsorber does not regenerate the
carbon bed directly in the control device, that is, a carbon canister is used,
the exhaust gas stream shall be monitored daily or at intervals no greater than
20% of the design replacement interval, whichever is greater. As an alternative
to conducting daily monitoring, the carbon may be replaced with fresh carbon at
a regular predetermined time interval that is less than the carbon replacement
interval that is determined by the maximum design flow rate and the VOC
concentration in the gas stream vented to the carbon adsorber.
e. For a flare, meet the requirements
specified in
40 CFR
60.18(b).
f. For a steam stripper, continuously monitor
and record the steam flow rate, the wastewater feed mass flow rate, and either
the wastewater feed temperature, or the column operating temperature as
measured in the column top tray liquid phase at the downcomer.
g. For vapor control systems other than those
specified in subds. 1. a. to f., continuously monitor and record the
appropriate operating parameters.
2. In lieu of the monitoring in subd. 1.,
other monitoring may be approved or required by the department with written
concurrence from EPA.
(e)
For a closed-vent system that is used to comply with sub. (2) or (3), and that
is designed to operate at a pressure below atmospheric pressure, the
closed-vent system shall be equipped with at least one pressure gauge or other
pressure measurement device that can be read from a readily accessible location
to verify that negative pressure is being maintained in the closed-vent system
when the control device is operating.
(5) APPROVED TEST METHODS. Compliance with
the emission specifications, vapor control system efficiency, and certain
control requirements, inspection requirements, and exemption criteria of subs.
(1) (b) and (2) to (4), relating to control requirements, alternate control
requirements, inspection and monitoring requirements, and exemptions, shall be
determined by applying one or more of the test methods and procedures, as
appropriate, in this subsection. Minor modifications to test methods and
procedures may be used, if approved by the department with written concurrence
from EPA. Test methods other than those specified in this subsection may be
used if validated by Method 301 in 40 CFR part 63, Appendix A, incorporated by
reference in s.
NR 484.04(25). The test methods are:
(a) Methods 1, 2, 3 and 4, in 40 CFR part 60,
Appendix A, incorporated by reference in s.
NR 484.04(13), for determining gas flow
rates, as necessary.
(b) Methods
18, 25, 25A, or 25B in 40 CFR part 60, Appendix A, incorporated by reference in
s.
NR 484.04(13), for determining organic
compound emission concentrations or emission rates.
(c)
1. For
control devices other than flares, the VOC control efficiency shall be
determined in accordance with s.
NR 439.07, where the flow rate and VOC concentration of
the inlet and outlet gas streams of the control device are measured as
specified under pars. (a) and (b).
(d) ASTM D323-08, D2879-10, D4953-06,
D5190-07, or D5191-10b, adjusted for actual storage temperature in accordance
with American Petroleum Institute publication 2517, incorporated by reference
in s.
NR 484.11(5), for the measurement of
vapor pressure. The ASTM methods are incorporated by reference in s.
NR 484.10(6), (39m), (55b), (55bg), and
(55br), respectively.
(e) Method 21 in 40 CFR part 60, Appendix A,
incorporated by reference in s.
NR 484.04(17), for monitoring a carbon
canister in accordance with sub. (4) (d) 1. d.
(f) For determining the VOC concentration of
wastewater samples, any of the methods in subds. 1. to 6., except that in the
event of any conflicts, subd. 6. shall take precedence.
1. Method 5030B followed by Method 8015C with
a DB-5 boiling point (or equivalent column), and flame ionization detector,
with the detector calibrated with benzene as required by 40 CFR part 261 .
Methods 5030B and 8015C are published in EPA Publication SW-846 "Test Methods
for Evaluating Solid Waste, Physical/Chemical Methods", incorporated by
reference in s.
NR 484.06(4)
(e).
2. Methods 5021A, 5030B followed by 8021B,
8260B, and 9060A as required by 40 CFR part 261, as published in EPA
Publication SW-846 "Test Methods for Evaluating Solid Waste, Physical/Chemical
Methods", incorporated by reference in s.
NR 484.06(4)
(e).
3. Methods 602, 624, 625, 1624B, 1625B of 40
CFR part 136, Appendix A, incorporated by reference in s.
NR 484.04(27s)
5. Method 5310(B) in Standard Methods for the
Examination of Water and Wastewater, 20th Edition, 1998, incorporated by
reference in s.
NR 484.11(12).
6. Method 25D in 40 CFR part 60, Appendix A,
incorporated by reference in s.
NR 484.04(20e). In the event of any
conflict, Method 25D takes precedence.
(g) The measurement of wastewater flow rate
shall be determined with flow measurement devices. Flow rate measurements shall
be taken at the same time as the concentration measurements.
(6) COMPLIANCE SCHEDULE. The owner
or operator of any facility subject to this section shall do all of the
following:
(a) Notify the department's bureau
of air management in writing by April 1, 2012 that the facility is subject to
the requirements of this section. The notification shall provide the name and
location of the affected facility.
(b) Achieve final compliance with the
requirements of this section no later than February 1, 2013.
(7) RECORDKEEPING. The owner or
operator of a facility subject to this section shall do all of the following:
(a) Maintain complete and up-to-date records
needed to demonstrate compliance with sub. (2) or (3) which are sufficient to
demonstrate the characteristics of wastewater streams and the qualification for
any exemptions claimed under sub. (1) (b).
(b) Maintain records of the results of any
inspection or monitoring conducted in accordance with sub. (4). Records shall
be sufficient to demonstrate proper functioning of applicable control equipment
to design specifications to ensure compliance with sub. (2) or (3).
(c) Maintain records of the results of any
testing conducted in accordance with sub. (5).
(d) Maintain all records at the facility for
at least 5 years and make all records available upon request to EPA and the
department.
(8)
DETERMINATION OF WASTEWATER CHARACTERISTICS. The determination of the
characteristics of a wastewater stream for purposes of this section shall be
made as follows:
(a) The characteristics shall
be determined at a location between the point where the process wastewater
exits a process unit and before the process wastewater is exposed to the
atmosphere, treated for VOC removal, or mixed with another wastewater stream.
For wastewater streams at a facility meeting the applicability requirements
under sub. (1) (a) 1. and 2. and which, prior to February 1, 2012, were either
actually being mixed, or construction had commenced which would result in the
wastewater streams being mixed, the mixing does not establish a limit on where
the characteristics may be determined.
(b) The flow rate of a wastewater stream
shall be determined on the basis of an annual average by one of the following
methods:
1. The highest annual quantity of
wastewater managed, based on historical records for the most recent 5 years of
operation, or for the entire time the wastewater stream has existed if less
than five years, but at least one year.
2. The maximum design capacity of the waste
management unit.
3. The maximum
design capacity to generate wastewater of the process unit generating the
wastewater stream.
4. Measurements
that are representative of the actual, normal wastewater generation
rates.
(c) The VOC
concentration of a wastewater stream shall be determined on the basis of a
flow-weighted annual average by one of the methods in this paragraph, or by a
combination of the methods. If the department determines, with written
concurrence from EPA, that the VOC concentration cannot be adequately
determined by the method in subd.1. or 2., the VOC concentration shall be
determined in accordance with subd. 3., or by a combination of the methods in
subds. 1., 2., and 3. VOC with a Henry's Law Constant less than 1.8 x
10-6 atm-m3/mole (0.1
y/x) at 25°C may not be included in the determination of VOC concentration.
1. Sufficient information to document the VOC
concentration.
Note: Examples of sufficient information include material balances, records of chemical purchases, or previous test results.
2. Sufficient information to
demonstrate that the bench-scale or pilot-scale test concentration data are
representative of the actual VOC concentration.
3. Collect a minimum of three representative
samples from the wastewater stream and determine the affected VOC concentration
for each sample in accordance with sub. (5). The affected VOC concentration of
the wastewater stream shall be the flow-weighted average of the individual
samples.
(d) The annual
affected VOC loading in wastewater for a wastewater stream shall be the annual
average flow rate determined in par. (b) multiplied by the annual average
affected VOC concentration determined in par. (c).
(e) The annual VOC loading in wastewater for
a facility shall be the sum of the annual VOC loading in wastewater for each
affected VOC wastewater stream.
(9) MAINTENANCE WASTEWATER REQUIREMENTS. Each
owner or operator of a source subject to this section shall comply with the
following requirements for maintenance wastewaters containing volatile organic
compounds:
(a) The owner or operator shall
prepare a description of maintenance procedures for management of wastewaters
generated from the emptying and purging of equipment in the process during
temporary shutdowns for inspections, maintenance, and repair and during periods
which are not shutdowns. The descriptions shall specify all of the following:
1. The process equipment or maintenance tasks
that are anticipated to create wastewater during maintenance
activities.
2. The procedures that
will be followed to properly manage the wastewater and control VOC emissions to
the atmosphere.
3. The procedures
to be followed when clearing materials from the process equipment.
(b) The owner or operator shall
modify and update the information required by par. (a) as needed following each
maintenance procedure based on the actions taken and the wastewaters generated
in the preceding maintenance procedure.
(c) The owner or operator shall maintain a
record of the information required under this subsection.
Notes