N.H. Code Admin. R. Puc 2506.01 - Metering of All Renewable Energy Sources

(a) Electricity generation in megawatt-hours, useful thermal energy expressed in megawatt-hours, and biodiesel production expressed in megawatt-hours shall be measured and verified in accordance with ISO-NE and GIS operating rules and this part.
(b) For each submission to GIS, the owner of a renewable energy source, the independent monitor, or the designated representative shall state in writing that the data is accurate.
(c) Each renewable energy source shall maintain all metering equipment in accordance with the manufacturer's specifications and recommendations.

Notes

N.H. Code Admin. R. Puc 2506.01

#9169, eff 6-3-08

Amended byVolume XXXV Number 01, Filed January 8, 2015, Proposed by #10741, Effective 12/5/2014. Amended by Volume XXXVIII Number 06, Filed February 8, 2018, Proposed by #12473, Effective 2/1/2018, Expires 2/1/2028.

State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.


No prior version found.