36 CFR Subpart B - Non-Federal Oil and Gas Rights
-
Definitions (§ 9.40)
-
Accessing Oil and Gas Rights From a Surface Location Outside the System Unit Boundary (§§ 9.70 - 9.73)
-
Operations Permit: Application Contents (§§ 9.80 - 9.90)
- § 9.80 Who must apply for an operations permit?
- § 9.81 May I use previously submitted information?
- § 9.82 What must I include in my application?
- § 9.83 What information must be included in all applications?
- § 9.84 Existing conditions and proposed area of operations.
- § 9.85 Environmental conditions and mitigation actions.
- § 9.86 Spill control and emergency preparedness plan.
- § 9.87 What additional information must be included if I am proposing geophysical exploration?
- § 9.88 What additional information must be included if I am proposing drilling operations?
- § 9.89 What additional information must be included if I am proposing well stimulation operations, including hydraulic fracturing?
- § 9.90 What additional information must be included if I am proposing production operations?
-
Operations Permit: Application Review Process (§§ 9.100 - 9.105)
- § 9.100 How will NPS process my application?
- § 9.101 How will the NPS conduct initial review?
- § 9.102 How will the NPS conduct formal review?
- § 9.103 What standards must be met to approve my operations permit?
- § 9.104 What final actions may the Regional Director take on my operations permit?
- § 9.105 What is the approval process for operations in Big Cypress National Preserve?
-
Operating Standards (§§ 9.110 - 9.118)
- § 9.110 What are the purposes and functions of NPS operating standards?
- § 9.111 What general facility design and management standards must I meet?
- § 9.112 What hydrologic standards must I meet?
- § 9.113 What safety standards must I meet?
- § 9.114 What lighting and visual standards must I meet?
- § 9.115 What noise reduction standards must I meet?
- § 9.116 What reclamation and protection standards must I meet?
- § 9.117 What additional operating standards apply to geophysical operations?
- § 9.118 What additional operating standards apply to drilling, stimulation, and production operations?
-
Financial Assurance (§§ 9.140 - 9.144)
- § 9.140 Do I have to provide financial assurance to the NPS?
- § 9.141 How does the NPS establish the amount of financial assurance?
- § 9.142 Will the NPS adjust my financial assurance?
- § 9.143 When will the NPS release my financial assurance?
- § 9.144 Under what circumstances will the NPS retain my financial assurance?
-
Modification to an Operation (§ 9.150)
-
Change of Operator (§§ 9.160 - 9.161)
-
Well Plugging (§§ 9.170 - 9.171)
-
Prohibitions and Penalties (§§ 9.180 - 9.182)
-
Reconsideration and Appeals (§§ 9.190 - 9.194)
- § 9.190 Can I, as operator, request reconsideration of NPS decisions?
- § 9.191 How does the NPS process my request for reconsideration?
- § 9.192 Can I appeal the Regional Director's decision?
- § 9.193 Will filing a request for reconsideration or appeal stop the NPS from taking action under this subpart?
- § 9.194 What if the original decision was made by the Superintendent?
-
Public Participation (§ 9.200)
-
Information Collection (§ 9.210)
Authority:
16 U.S.C. 230a(a)(4), 459d-3, 460cc-2(i), 460ee(c)(4), 698c(b)(2), 698i(b)(2), and 698m-4; 18 U.S.C. 3571 and 3581; 31 U.S.C. 9701; 54 U.S.C. 100101, 100751, and 103104.
Source:
81 FR 77992, Nov. 4, 2016, unless otherwise noted.